Tuesday, July 31, 2012

[Mahagunpuram] Interested in selling off my flat

Dear All,
I want to sell off my flat no. 715/Vidhi (1300 sq.ft.).Interested buyers may contact me at arunandark@gmail.com with their offer price.

A K Nanda
9810823945


[Mahagunpuram] Sell Offer

hi mahagun puram group,
i think i need no introduction in the group, i am owner of flat no-1303,
riddhi appt in mahagun, likely possession in Oct-Nov 12. Due to some
financial commitments i am planning to sell off my flat. its a 1100 sqft
2.5 bhk property with no dues and all payments incl interest and allied
charges paid. Interested buyers pl mail with price offer.
thanks

- Mukul Gupta

[Mahagunpuram] anybody booked flat in mahagunpuram through investors clinic

hi, i booked flat in mahagunpuram through investors clinic. under their carnival offer on 27th may 2012. i contacted ic and they are saying they will give the gifts on offer of possession. is it true..



Re: [Mahagunpuram] Shared EMI cheques beyond June



What does EMI cheque means .......is it penalty cheque?

--- On Fri, 27/7/12, Sandeep Pander <sandeep.pandey82@gmail.com> wrote:

From: Sandeep Pander <sandeep.pandey82@gmail.com>
Subject: Re: [Mahagunpuram] Shared EMI cheques beyond June
To: "MahagunpuramRWA@yahoogroups.com" <MahagunpuramRWA@yahoogroups.com>
Cc: "MahagunpuramRWA@yahoogroups.com" <MahagunpuramRWA@yahoogroups.com>
Date: Friday, 27 July, 2012, 12:13 PM

 
Shared EMI chqs wll be ready in aug  1st week, possestion of viddhi likely in Nov- Dec if everything goes fine.

Sent from my iPhone

[Mahagunpuram] Re: Shared EMI cheques beyond June

Dear Mr Arun Kumar Nanda,

As requested by You, the e-mail ID of Mahagun is customercare@mahagunindia.com and the name of official at Mahagun is Ms. Vinita Rajput (Mobile Number - 9310638304).

The likely date for possession for Vidhi and other details would be intimated to you by them only. Kindly e-mail to them and also you can speak with Ms Vinita Rajput regarding this.

Regards,

Anand Kumar Sharma
27th July, 2012
A-236, First Floor, Pandara Road, New Delhi - 110003.
Tele : 9582346656, 9868314171, 23074443 (Res).

Re: [Mahagunpuram] Shared EMI cheques beyond June

Shared EMI chqs wll be ready in aug  1st week, possestion of viddhi likely in Nov- Dec if everything goes fine.

Sent from my iPhone

On 27 Jul, 2012, at 2:15 PM, "arunandark" <arunandark@yahoo.com> wrote:

 
Hi,
Has anyone received shared EMI cheques beyond June 2012? Is there any customer care email ID of Mahagun? What is the likely date for possession for Vidhi? Does anyone have any idea?

Arun Kumar Nanda
9810823945
715/Vidhi


[Mahagunpuram] Shared EMI cheques beyond June

Hi,
Has anyone received shared EMI cheques beyond June 2012? Is there any customer care email ID of Mahagun? What is the likely date for possession for Vidhi? Does anyone have any idea?

Arun Kumar Nanda
9810823945
715/Vidhi

Saturday, July 21, 2012

[Mahagunpuram] Important contact details.

Dear All,

Along with member's, we have also started to keep other important phone/email ids in the group.

Please visit http://groups.yahoo.com/group/MahagunpuramRWA/database and add your details... and also of any Mahagun's official details.

-Moderator


Re: [Mahagunpuram] Received Penalty cheque in Hand for Month Apr - Jun



Good to know they are giving penalty checques. bt when will they give possession? and when will they finish phase 2?
Regards,
Saumyajit Ray
971, Kaveri

Friday, July 20, 2012

Re: [Mahagunpuram] Received Penalty cheque in Hand for Month Apr - Jun

Hi,

Can somebody pass Vinita, Mahagunpuram Number?

Thanks
GD

--- In MahagunpuramRWA@yahoogroups.com, saurabh agrawal <saurabh_life2002@...> wrote:
>
> Hi All,
>
> I received the penalty cheque in hand from mahagun of Rs. 19500 (6500 *3 ) for the month of Apr - Jun.
> Please visit Mahagun office and receive your cheques.
>
> Thanks & Regards,
>
> Saurabh Kr. Agrawal
>
> Mob: 09540583838

[Mahagunpuram] Received Penalty cheque in Hand for Month Apr - Jun


Hi All,

I received the penalty cheque in hand from mahagun of Rs. 19500 (6500 *3 ) for the month of Apr - Jun.
Please visit Mahagun office and receive your cheques.

Thanks & Regards,
Saurabh Kr. Agrawal
Mob: 09540583838

Re: [Mahagunpuram] Received Penalty cheque call from Mahagun



Thanks Saurabh
Bharat
Sent from Samsung Galaxy
On 20 Jul 2012 16:40, "saurabh agrawal" <saurabh_life2002@yahoo.co.in> wrote:

 
Hi All,

I received Penalty check collection call from Mahagun today for the month of Apr-Jun.
I hope all of you might be getting the same call.

Thanks,
Saurabh

[Mahagunpuram] Received Penalty cheque call from Mahagun



Hi All,

I received Penalty check collection call from Mahagun today for the month of Apr-Jun.
I hope all of you might be getting the same call.

Thanks,
Saurabh

Wednesday, July 18, 2012

Re: [MAHAGUNPURAM] BREAKUP OF FINAL PAYMENT AT THE TIME OF POSSESSION



Friends,

Sinking charges are to be  paid  other then maint charges, And same is also mentioned in agreement. Sinking fund is basically in view of upgradation or enhancment of capacity of  equipments like DG set ,lifts etc..

As per agreement same amount will be transferred to RWA after handover if not utilized.



On Tue, Jul 17, 2012 at 11:57 AM, dwivedi_gm <dwivedi_gm@yahoo.com> wrote:

 
I think sinking charges would be part of monthly maintenance charges.

--- In MahagunpuramRWA@yahoogroups.com, Sandip Roy <sandiproynavy@...> wrote:
>
> sinking charge???
>


Re: [MAHAGUNPURAM] BREAKUP OF FINAL PAYMENT AT THE TIME OF POSSESSION

I think sinking charges would be part of monthly maintenance charges.

--- In MahagunpuramRWA@yahoogroups.com, Sandip Roy <sandiproynavy@...> wrote:
>
> sinking charge???
>


Monday, July 16, 2012

Re: [MAHAGUNPURAM] BREAKUP OF FINAL PAYMENT AT THE TIME OF POSSESSION



sinking charge???

On Mon, Jul 16, 2012 at 12:58 PM, dwivedi_gm <dwivedi_gm@yahoo.com> wrote:

 
Hi Anand Ji,

So long list of charges.... :D hmmmm... its not going to be that long.
The list of payables are written in buyer/seller agreement. Majority, you will be paying:

Basic Cost + Additional Cost + Service tax [on all the payments after Jul 2012] to the builder.

Registry charges to GDA

Legal charges includes lawyer's fee, to be paid to Mahagun [who in turn will pay to his lawyer].

Registry Admin charges from Mahagun.

Dual Meter charges to Mahagun

IFMS charges to Maintenance agency.

Regular/Advance maintenance charges.

Anybody please add, if I am missing anything.

-GD

[MAHAGUNPURAM] LIKELY DATE OF OFFER OF POSSESSION LETTER FOR RIDDHI BLOCK

Does anybody knows the likely month (2012/2013) of possession of Riddhi Block, likely month (2012/2013) when we will receive the letter for total charges (Offer of Possession) for Riddhi Block.

Regards,

Anand Kumar Sharma
16th July, 2012.
A-236, First Floor, Pandara Road, New Delhi - 110003.
Tele : 9868314171, 9582346656 and 23074443.


[Mahagunpuram] Charges at possession

Dear friends
Just a rough idea of expenses at possession-

Basic cost + PLC/Car Parking/EDC, EEC, FFC/Service Tax we are already paying as per schedule.
Maintenance Charges -- Rs 1/sq ft for 24 months(31200/-1300 sq ft)
Advance of WC & EC -- Rs 20,000/-
Sinking Fund -- Rs 10,000/-
Stamp Duty -- 7% of basic cost for male, 6% for female and 6.5% for joint to GDA
Registry -- Rs 10200/- per person to GDA
Legal -- Rs 15000/ Appx to Mahagun
Extra ???? -- Rs 10000/- Apxx
Interest on late payment-- you must have paid.

Re: [Mahagunpuram] Regarding Penalty Cheques



They've said it will be after July 29th.

Sent from BlackBerry® on Airtel

From: "anurag_shrotriya" <anurag_shrotriya@yahoo.co.in>
Sender: MahagunpuramRWA@yahoogroups.com
Date: Mon, 16 Jul 2012 10:36:14 -0000
To: <MahagunpuramRWA@yahoogroups.com>
ReplyTo: MahagunpuramRWA@yahoogroups.com
Subject: [Mahagunpuram] Regarding Penalty Cheques

 
Dear All

Does anybody receive penalty cheque for April, May & June?

Regards
Anurag Shrotriya
Flat No 108 Riddhi


[Mahagunpuram] Regarding Penalty Cheques

Dear All

Does anybody receive penalty cheque for April, May & June?

Regards
Anurag Shrotriya
Flat No 108 Riddhi


[Mahagunpuram] Please check/add/update your contact details

Dear All,

We have finished migration of all the contact details from the contact excel, which we used previously. The same has been moved to :
http://groups.yahoo.com/group/MahagunpuramRWA/database?method=reportRows&tbl=2

Please access this link to see, if your details are correctly added. If not, just reply to this thread and I will be happy to update.

If you can not find the same, please add an entry to the database.

If it is correct, just acknowledge that its correct and fine.

Thanks
-Moderator.

* Please note that the link is available only to the members of this group. So, kindly join this group before you can update the same.


Re: [MAHAGUNPURAM] BREAKUP OF FINAL PAYMENT AT THE TIME OF POSSESSION

Hi Anand Ji,

So long list of charges.... :D hmmmm... its not going to be that long.
The list of payables are written in buyer/seller agreement. Majority, you will be paying:

Basic Cost + Additional Cost + Service tax [on all the payments after Jul 2012] to the builder.

Registry charges to GDA

Legal charges includes lawyer's fee, to be paid to Mahagun [who in turn will pay to his lawyer].

Registry Admin charges from Mahagun.

Dual Meter charges to Mahagun

IFMS charges to Maintenance agency.

Regular/Advance maintenance charges.

Anybody please add, if I am missing anything.

-GD

--- In MahagunpuramRWA@yahoogroups.com, "anasee2162" <anasee2162@...> wrote:
>
> DOES ANYBODY KNOWS THE DATE OF POSSESSION OF FLATS AND BREAKUP OF FINAL AMOUNT THAT WOULD BE PAYABLE BY US AT THE TIME OF POSSESSION OF FLAT AT MAHAGUNPURAM, NH-24 TOWARDS REGISTRATION CHARGES, COST OF STAMP PAPERS, DOCUMENTATION FEES, OFFICIAL FEES, FILE CHARGES, MAINTENANCE CHARGES, INSURANCE CHARGES, ELECTRICITY METER CHARGES, WATER METER CHARGES, SINKING FUND CHARGES, LAWYER CHARGES (LEGAL/ADMIN CHARGES), COURT FEE (IN CASH), MISCELLANEOUS CHARGES, ETC. MY FLAT NUMBER 1106, 11TH FLOOR, HIG-II, RIDDHI BLOCK.
>
> REGARDS,
>
> ANAND KUMAR SHARMA
> 15TH JULY, 2012.
> A-236, FIRST FLOOR, PANDARA ROAD, NEW DELHI - 110003.
> TELE : 9582346656, 9868314171, 23074443 (RES).
>

Saturday, July 14, 2012

Re: [Mahagunpuram] Need flat in Mahagunpuram



Dear Mr.Gaurav,
My flat(2 BHK) is in Kaveri in 12th floor & want to sell at 2550/-sq.feet+parking & others if interested kindly let me know.
Dr.Atul K.Agarwal

--- On Sat, 7/14/12, Gaurav K <gaurav.kan@gmail.com> wrote:

From: Gaurav K <gaurav.kan@gmail.com>
Subject: [Mahagunpuram] Need flat in Mahagunpuram
To: MahagunpuramRWA@yahoogroups.com
Date: Saturday, July 14, 2012, 9:02 AM

 
Hi, I bought a flat in mahagunpuram and now two of my relatives are also looking for a flat here.
One 2bhk and one 3 bhk is required.
If anyone is interested in resale, please contact me.

Gaurav
9953461764

[Mahagunpuram] Need flat in Mahagunpuram

Hi, I bought a flat in mahagunpuram and now two of my relatives are also looking for a flat here.
One 2bhk and one 3 bhk is required.
If anyone is interested in resale, please contact me.

Gaurav
9953461764

[MAHAGUNPURAM] FINAL PAYMENT AT THE TIME OF POSSESSION

DOES ANYBODY KNOWS THE FINAL AMOUNT THAT WOULD BE PAYABLE BY US AT THE TIME OF POSSESSION OF FLAT AT MAHAGUNPURAM, NH-24 TOWARDS REGISTRATION CHARGES, COST OF STAMP PAPERS, DOCUMENTATION FEES, OFFICIAL FEES, FILE CHARGES, MAINTENANCE CHARGES, INSURANCE CHARGES, ELECTRICITY METER CHARGES, WATER METER CHARGES, SINKING FUND CHARGES, LAWYER CHARGES (LEGAL/ADMIN CHARGES), COURT FEE (IN CASH), MISCELLANEOUS CHARGES, ETC. MY FLAT NUMBER 1106, 11TH FLOOR, HIG-II, RIDDHI BLOCK.

REGARDS,

ANAND KUMAR SHARMA
13TH JULY, 2012.
A-236, FIRST FLOOR, PANDARA ROAD, NEW DELHI - 110003.
TELE : 9582346656, 9868314171, 23074443 (RES).


Thursday, July 12, 2012

Re: [Mahagunpuram] Regarding Possesion



thnx Pradeepji. Hope your optimism pays.

On Wed, Jul 11, 2012 at 4:41 PM, Sandeep Pander <sandeep.pandey82@gmail.com> wrote:

 
True n this issue is mostly with DELHI/NCR builders which are delaying projects.


Regards
Sandeep Pandey
Viddhi -1310

Sent from my iPhone

On 11 Jul, 2012, at 6:48 PM, Bharat Bhushan <bharat.indo@gmail.com> wrote:

 
I do agree with everybody but there is a limit. Everybody has cherished one dream of dream house which nonody so far has achieved which is causing them to annoy.
Bharat
Sidhi 1020
Sent from Samsung Galaxy
On 11 Jul 2012 16:13, "Pradeep Bhatt" <bhatt26@gmail.com> wrote:


Wednesday, July 11, 2012

[Mahagunpuram] NH-24 to be widened soon

NOIDA: Widening of the NH-24 between the Delhi border and Dasna into a six-lane corridor is finally going to start this month after the Noida Authority and National Highways Authority of India met on Tuesday and gave approval to the project. While tenders for the proposed project will be released later this month, the widening is estimated to cost Rs 150 crore.

The broadening of the 21km stretch from UP Gate to Dasna, which is used by over 2 lakh vehicles on a weekday, will bring relief to commuters who often get caught in long jams. "Once this project is complete, it will improve connectivity between Delhi and parts of Ghaziabad and Noida," said Pramanshu Kumar, Additional CEO, Noida Authority. "The expansion of NH-24 is of utmost importance. Given the traffic load on the stretch, the widening work will now be fast tracked to avoid any further delay," Kumar said.

After the widening, an additional lane of 3.5m width will be available on either side of the carriageway. The ACEO said that five underpasses would be constructed at regular intervals so that traffic between Noida and Indirapuram would be smooth without going to NH-24.

Presently, the four-lane road from Ghaziabad border to Dasna is one of the most congested highway corridors in the country. Once completed, this stretch would become almost signal-free. Unlike the Delhi-Gurgaon expressway, this stretch will not be a toll road. Sources said this decision was taken considering that a large section of the traffic using this stretch is local. The traffic on this road is expected to grow in view of increased occupancy in residential areas along NH-24, including Indirapuram and Crossings Republik, the two big sub-cities of Ghaziabad.

Though the plan for the widening of the stretch was conceived almost six years ago, somehow it did not take off. Due to traffic congestion on UP border-Dasna stretch, the exercise to develop it as a six-lane route was re-started three years back.

The NH-24 starts from Nizamuddin from Delhi and ends at Lucknow via Hapur, Moradabad, Bareilly and Sitapur. The stretch between Nizamuddin Bridge and Indirapuram is one of the busiest during peak hours. About two years ago, the daily traffic movement on this stretch was nearly 1.4 lakh passenger car units (PCUs). A traffic survey by Rites in 2008 showed that vehicular growth on this stretch had increased by almost 200% more than the highway's carrying capacity.

In April earlier this year, the highway ministry had proposed to carry out the work of the widening on contract and a tender was also floated, but the plan was scrapped later. NHAI had then proposed to widen this portion as part of the Delhi-Meerut expressway project on build, operate and transfer (BOT-toll) mode. In that case, private developers would have financed the entire project.


Re: [Mahagunpuram] Regarding Possession



Dear Mr. Ray,

Don't be hopeless . There might be various reason in delay for phase 1, but once phase 1 is complete phase 2 will not take so much time. Because some of basic and most important requirements will be already done, like approval of authorities, water , electricity connection,  etc.

On Tue, Jul 10, 2012 at 7:42 PM, Saumyajit Ray <ray.saumyajit@gmail.com> wrote:

 
Dear All!

If this is the situation of Phase-I, then what will happen to Phase-II? I have booked a flat in Kaveri (Phase-II). First they said the will give possession by September 2013, now it seems unlikely before 2016...or may be next life....lol...

Best and sincere regards,

Dr. Saumyajit Ray
971, Kaveri

Re: [Mahagunpuram] Regarding Possession



True n this issue is mostly with DELHI/NCR builders which are delaying projects.


Regards
Sandeep Pandey
Viddhi -1310

Sent from my iPhone

On 11 Jul, 2012, at 6:48 PM, Bharat Bhushan <bharat.indo@gmail.com> wrote:

 
I do agree with everybody but there is a limit. Everybody has cherished one dream of dream house which nonody so far has achieved which is causing them to annoy.
Bharat
Sidhi 1020
Sent from Samsung Galaxy
On 11 Jul 2012 16:13, "Pradeep Bhatt" <bhatt26@gmail.com> wrote:

 
Dear Mr. Ray,

Don't be hopeless . There might be various reason in delay for phase 1, but once phase 1 is complete phase 2 will not take so much time. Because some of basic and most important requirements will be already done, like approval of authorities, water , electricity connection,  etc.

On Tue, Jul 10, 2012 at 7:42 PM, Saumyajit Ray <ray.saumyajit@gmail.com> wrote:


Re: [Mahagunpuram] Regarding Possession



I do agree with everybody but there is a limit. Everybody has cherished one dream of dream house which nonody so far has achieved which is causing them to annoy.
Bharat
Sidhi 1020
Sent from Samsung Galaxy
On 11 Jul 2012 16:13, "Pradeep Bhatt" <bhatt26@gmail.com> wrote:

 
Dear Mr. Ray,

Don't be hopeless . There might be various reason in delay for phase 1, but once phase 1 is complete phase 2 will not take so much time. Because some of basic and most important requirements will be already done, like approval of authorities, water , electricity connection,  etc.

On Tue, Jul 10, 2012 at 7:42 PM, Saumyajit Ray <ray.saumyajit@gmail.com> wrote:

 
Dear All!

If this is the situation of Phase-I, then what will happen to Phase-II? I have booked a flat in Kaveri (Phase-II). First they said the will give possession by September 2013, now it seems unlikely before 2016...or may be next life....lol...

Best and sincere regards,

Dr. Saumyajit Ray
971, Kaveri

On Tue, Jul 10, 2012 at 7:22 PM, Raghu Pal Singh <singhraghupal@yahoo.com> wrote:


[Mahagunpuram] Re: Regarding Possession



Thanks Arvind Ji. I do agree with you. Site photographs themselves reveal this truth. I expect possession by March 2013. I wish I am wrong.
Bharat
Sidhi 1020
M: 9591324331
Sent from Samsung Galaxy


Tuesday, July 10, 2012

Re:[Mahagunpuram] Regarding Possession

Hi Everyone,

I am Arvind Kumar Maurya...This first time when i am writing something from "Yahoo Blog" but on previous blog I shared few information....

I had visited Mahagunpuram development site on Saturday 6th July'2012 i.e. ..Honestly speaking I don't see any posession in this year'12. feeling bad to share this but actual site development condition is like this, Looks to me that they will not start any possession until park surrounded all towers are ready.

Many times i tried to get some official information from Mahagaunpuram noida office but could not able to get any offical possession date.

It doesn't look Mahagun builder has any actual project delivery plan in place. All development site progresses are on adhoc basis, every time you talk to them i.e. a new possession date comes in front of us. I was told my one of very reliable Marketing executive that from August'12 they would possession for two towers (15th story buildings) and in consequtive months i.e Nov/Dec'12...

But nothing is official..All above said dates I got it is just over the phone.

If anyone has any official confirmation on Possession date please share.

Thanks
Arvind [9871485132]- Located in In indirapuram Ghaziabad


[Mahagunpuram] Re: Regarding Possession

Yes.. it is expected to delay further for below two factors:

- GDA is inspecting all the projects across GZB for irregularities. So, All project wor are on hold since last month, till all the clearance are submitted. As far I now Mahagun , they are NOT expected to be all cleared!!!

- Rainy season usually attribute of slow pace of all works..

-GD

Re:[Mahagunpuram] Regarding Possession

Hi,
Friends. Thanks for the updates. As per the photos and construction status, it seems to be impossible to get the possession by Dec-2012. Now the rainy season also started. Hope for the best. I am also ready to shift as the provide us.

Thanking You,

Tapan
1426 Vinayak

Hoping a great neighbourhood


Re: [Mahagunpuram] Regarding Possession



Hi all,
My warm greetings to all RWA members, my flat no is 1310 Viddhi
Any one can please inform on Viddhi possession status

Sent from my iPhone

[Mahagunpuram] Re: Regarding Possession



:) happyfeeling great to be a member of RWA.  Please accept my warm wishes.
Myself Ravinder Singh Nainwal, 653 Ganga Tower.
Actually i am not aware about the possession of Ganga Tower.  If anybody, please let me know.
Regards.:) happy 



From: Shridhar <pathaks_1978@yahoo.co.in>
To: rsinghn123@yahoo.in
Sent: Thursday, 5 July 2012 4:01 PM
Subject: Greetings

Hi rsinghn how come? i am sridhar Ganga 453. any news about possession etc.


Re: [Mahagunpuram] Regarding Possesion



Dear All!

If this is the situation of Phase-I, then what will happen to Phase-II? I have booked a flat in Kaveri (Phase-II). First they said the will give possession by September 2013, now it seems unlikely before 2016...or may be next life....lol...

Best and sincere regards,

Dr. Saumyajit Ray
971, Kaveri

On Tue, Jul 10, 2012 at 7:22 PM, Raghu Pal Singh <singhraghupal@yahoo.com> wrote:

 
pradeep ji

puram project is already delay. YOUR WORDS ARE TRUE. THAT NO BUILDERS GIVE POSSESSION IN RIGHT TIME.

I live in Chiranjiv Vihar just behind to MAHAGUNPURAM.  and i had watched the every stage of construction the speed they had shown in last 4 months is appreciable.

no doubt

UMMED PAR DUNIYA KAYAM HAI.

REGARDS

R.P

Re: [Mahagunpuram] Regarding Possession



pradeep ji

puram project is already delay. YOUR WORDS ARE TRUE. THAT NO BUILDERS GIVE POSSESSION IN RIGHT TIME.

I live in Chiranjiv Vihar just behind to MAHAGUNPURAM.  and i had watched the every stage of construction the speed they had shown in last 4 months is appreciable.

no doubt

UMMED PAR DUNIYA KAYAM HAI.

REGARDS

R.P

--- On Tue, 7/10/12, Pradeep Bhatt <bhatt26@gmail.com> wrote:

From: Pradeep Bhatt <bhatt26@gmail.com>
Subject: Re: [Mahagunpuram] Vidhi -711 - Arvind Kumar Maurya
To: MahagunpuramRWA@yahoogroups.com
Date: Tuesday, July 10, 2012, 5:29 AM

 
Mahagun will never declare offcial date for possession , every builder used to be safe side.

I have inquired to mahagun through mail. but they never revert on the mail for poesseion.
On Tue, Jul 10, 2012 at 9:11 AM, Raghu Pal Singh <singhraghupal@yahoo.com> wrote:


Monday, July 9, 2012

Re: [Mahagunpuram] Regarding Possession



Mahagun will never declare offcial date for possession , every builder used to be safe side.

I have inquired to mahagun through mail. but they never revert on the mail for poesseion.

On Tue, Jul 10, 2012 at 9:11 AM, Raghu Pal Singh <singhraghupal@yahoo.com> wrote:

 
HELLO

TO ALL MAHAGUN FAMILY MEMBERS

I AM R.P.SINGH I HAD VISITED THE SIGHT. AND I HOPE 2-3 BUILDING WORK PROGESS IS QUITE GOOD AND I HOPE MAHAGUN WILL DEFINATELY GIVE POSSESSION TILL. DEC 2012

THOUGH MY FLAT IS IN BHGIRATHI THAT WILL TAKE TIME MAY BE TILL MARCH 2013 

BOPE FR THE BEST . WE SHOULD BE MORE POSITIVE.

REGARDS

R.P 

8860093642


Re: [Mahagunpuram] Regarding Possession



HELLO

TO ALL MAHAGUN FAMILY MEMBERS

I AM R.P.SINGH I HAD VISITED THE SIGHT. AND I HOPE 2-3 BUILDING WORK PROGESS IS QUITE GOOD AND I HOPE MAHAGUN WILL DEFINATELY GIVE POSSESSION TILL. DEC 2012

THOUGH MY FLAT IS IN BHGIRATHI THAT WILL TAKE TIME MAY BE TILL MARCH 2013 

BOPE FR THE BEST . WE SHOULD BE MORE POSITIVE.

REGARDS

R.P 

8860093642



--- On Mon, 7/9/12, cyberarvind <cyberarvind@yahoo.com> wrote:

From: cyberarvind <cyberarvind@yahoo.com>
Subject: [Mahagunpuram] Vidhi -711 - Arvind Kumar Maurya
To: MahagunpuramRWA@yahoogroups.com
Date: Monday, July 9, 2012, 1:23 PM

 
Hi Everyone,

I am Arvind Kumar Maurya...This first time when i am writing something from "Yahoo Blog" but on previous blog I shared few information....

I had visited Mahagunpuram development site on Saturday 6th July'2012 i.e. ..Honestly speaking I don't see any posession in this year'12. feeling bad to share this but actual site development condition is like this, Looks to me that they will not start any possession until park surrounded all towers are ready.

Many times i tried to get some official information from Mahagaunpuram noida office but could not able to get any offical possession date.

It doesn't look Mahagun builder has any actual project delivery plan in place. All development site progresses are on adhoc basis, every time you talk to them i.e. a new possession date comes in front of us. I was told my one of very reliable Marketing executive that from August'12 they would possession for two towers (15th story buildings) and in consequtive months i.e Nov/Dec'12...

But nothing is official..All above said dates I got it is just over the phone.

If anyone has any official confirmation on Possession date please share.

Thanks
Arvind [9871485132]- Located in In indirapuram Ghaziabad



Thursday, July 5, 2012

Mahagunpuram: More development pictures - Jun 2012

Friends... Here is more pictures:

Shopping Complex

Gayatri

Club House

Bhagirathi

Riddhi

Siddhi & Saraswati

Viddhi


Ganga

Vinayak







RE: [Mahagunpuram] Re: Latest View of Project



Hi Pradeep Ji,

I will shift to the flat asa builder offers possession. My name is Saurabh. Hope to have a great neighbourhood. Though the buildings are different.
 Flat 1441 Saraswati

Tuesday, July 3, 2012

Mahagunpuram: More images from development site with internal views

Friends,

Although mansoon is away, its raining images from development site... Thanks to all the active members..
Please find below more images from Pradeep Bhatt Ji, with internal views of the flat.
















Re: [Mahagunpuram] Latest View of Project



Dear Friends,

Visited to day at site.

Siddhi and Saraswati tower seems to be ready by Aug end with surroundings and Mahagun may offer possession. Sharing more photographs.

I m  seeking for the people who are ready to shift  when builder offer possession.

My self , Siddhi 1118 and ready to shift ASAP subject to site condition..  



On Tue, Jul 3, 2012 at 10:21 AM, dwivedi_gm <dwivedi_gm@yahoo.com> wrote:

 
More pictures including few from Phase 2 has also been posted, courtesy Narendra Singh.. Between, I saw an advetisement yesterday on NH24 with 'Mahagunpuram - Possession in 4 Month'.

Monday, July 2, 2012

MahagunPuram: More Pics from Development Site - 30Jun2012

Friends,

Our esteemed member, Narendra Singh has posted more pics.. Here it follows ....
Meanwhile, I saw an advertisement yesterday with 'Possession in 4 Month' for Mahagunpuram.


Main Gate

Phase 2

Neighborhood - Ansal Tanushree


Club House

Ganga

New DG Set

Bhagirathi





Sunday, July 1, 2012

Re: [Mahagunpuram] Latest View/Picture of Project

Friends,
Here is the latest images from development sit, shared by Rajeev Ji.
To know the details, visit our yahoogroup and check photo section.











[Mahagunpuram] Latest View/Picture of Project

Hi Freinds
              If any one visit the project today.kindly take some photo for those who are not in position to reach there to see project status.

Thanks & Regards

Pradeep/Mamta