Sunday, January 29, 2017

[Mahagunpuram] Request for Sanctioning of UPSRTC Bus Route from Mehrauli Railway Station, NH-24, Ghaziabad (Uttar Pradesh) to Shivaji Stadium, Connaught Place, New Delhi / New Delhi Railway Station & Back and Bus Stands (Bus Stops) at various places along NH-24, Ghaziabad (Uttar Pradesh) / Delhi. [2 Attachments]

[Attachment(s) from anasee2162@yahoo.in [MahagunpuramRWA] included below]

Request for Sanctioning of UPSRTC Bus Route from Mehrauli Railway Station, NH-24, Ghaziabad (Uttar Pradesh) to Shivaji Stadium, Connaught Place, New Delhi / New Delhi Railway Station & Back and Bus Stands (Bus Stops) at various places along NH-24, Ghaziabad (Uttar Pradesh) / Delhi.

 

MP-AOA (Mahagunpuram Apartment Owners Association, Mahagunpuram, NH-24, Mehrauli, Ghaziabad, Uttar Pradesh); AOA Federation Ghaziabad (Regd); RWAs/AOAs of Housing Projects along NH-24, Ghaziabad (Uttar Pradesh) and all residents residing along NH-24, Ghaziabad (Uttar Pradesh) are also requested to send their requests on the above subject in the following way as it will help in speedy approval of the same :-


---------- Forwarded message ----------

From :  Anand Kumar Sharma <anasee2162@gmail.com>

Date :  Sun, Jan 29, 2017 at 9:48 PM

Subject :  Request for Sanctioning of UPSRTC Bus Route from Mehrauli Railway Station, NH-24, Ghaziabad (Uttar Pradesh) to Shivaji Stadium, Connaught Place, New Delhi / New Delhi Railway Station & Back and Bus Stands (Bus Stops) at various places along NH-24, Ghaziabad (Uttar Pradesh) / Delhi.

 

To :  tc-up@nic.in, atca-up@nic.in, atce-up@nic.in, atchq-up@nic.in, fctco-up@nic.in, statco-up@nic.in, rtogz-up@nic.in, amd@upsrtc.com, cgmo@upsrtc.com, fc@upsrtc.com, Manish Kumar <rmgzb@upsrtc.com>, armogzb@upsrtc.com, armpgzb@upsrtc.com, helpline@upsrtc.com

Cc :  "Gen V. K. Singh" <eloksabhagzb@gmail.com>, MOS VKS <mosvkso@mea.gov.in>, vksingh.mp@sansad.nic.in, cmup@nic.in, upinformation@nic.in, csup@up.nic.in, ncrpb-ms@nic.in, ncrpb-dr@nic.in, ncrpb-jd1@nic.in, ncrpb-aa02@nic.in, shreeprakash54@hotmail.com, awas@up.nic.in, "Awas Bandhu U.P." <awasbandhu@gmail.com>, SO NAGAR VIKAS <so.nagarvikas@gmail.com>, diruplb@nic.in, ISHWAR CHAND JINDAL <icjindal@gmail.com>, Gaurav Dwivedi <ergauravdwivedi@gmail.com>, Saurabh Bansal <tosaurabh7@yahoo.co.in>, gargparveen1971@yahoo.co.in, RWA uttam g <uttam.singh@kanbaninfosystem.com>, Jatinder kumar <jks.gzb@gmail.com>, cyberarvind@yahoo.com, Arvind Tiwari <er.arvindtiwari@gmail.com>, "saxena111@gmail.com" <saxena111@gmail.com>, ajaykaushik74@yahoo.com, AOA Federation Ghaziabad <aoafedgzb2015@gmail.com>, RWA Federation Gzb <rwafedgzb6@gmail.com>, Tejandra Pal Tyagi <tptyagi@gmail.com>, mahagunpuram aoa <mahagunpuramaoa@gmail.com>, "sheetal_tyg@yahoo.co.in" <sheetal_tyg@yahoo.co.in>, Sheetal Tyagi <sheetaltyagi1981@gmail.com>, surjeet singh <surjeet_cavs@yahoo.co.uk>, TAPAN KUMAR <smarttapan@yahoo.com>, TAPAN panigrahi <smartone.tapan@gmail.com>, gauravvanshi@yahoo.com, tanweer1008@yahoo.com, Avdhesh Kumar <avdheshks@gmail.com>, vnrsa@yahoo.com, Subhash Verma <subhashchandraverma@gmail.com>

To

 

Transport Commissioner,

Department of Transport,

Government of Uttar Pradesh,

Lucknow - 226001,

Uttar Pradesh.

 

Chairman,

Uttar Pradesh State Road Transport Corporation (UPSRTC),

UPSRTC HQ, Parivahan Bhawan,

Tehri Kothi, M.G. Marg,

Lucknow – 226001,

Uttar Pradesh.

 

Subject : Request for Sanctioning of UPSRTC Bus Route from Mehrauli Railway Station, NH-24, Ghaziabad (Uttar Pradesh) to Shivaji Stadium, Connaught Place, New Delhi / New Delhi Railway Station & Back and Bus Stands (Bus Stops) at various places along NH-24, Ghaziabad (Uttar Pradesh) / Delhi.


Respected Sir / Madam,

 

1.      Kindly refer to my requests dated 8th April, 2013; 15th April, 2013; 21st April, 2013; 1st May, 2013; 14th May, 2013; 3rd June, 2013; 24th June, 2013; 20th July, 2013; 18th August, 2013; 29th September, 2013; 1st November, 2013; 23rd November, 2013; 13th December, 2013; 3rd January 2014; 1st February, 2014; 16th February, 2014; 8th March, 2014; 2nd April, 2014; 14th April, 2014; Speed Post Letter dated 2nd May, 2014; 16th May, 2014; 24th June, 2014; 3rd July, 2014; 10th July, 2014; 1st August, 2014; 1st September, 2014; 4th October, 2014; 4th November, 2014; 27th November, 2014; 27th December, 2014; 11th April, 2015; 12th May, 2015; 12th July, 2015; 3rd May, 2016; 25th July, 2016; 16th September, 2016 and 6th November, 2016 on the above subject.  I am, once again, requesting for the same.

 

2.      Also, kindly refer to replies dated 4th May, 2013 and 2nd July, 2015 received from UPSRTC, Lucknow on the above subject.  No definite timeframe has been given by UPSRTC for starting the above Bus Route and also making of Bus Stands (Bus Stops) at various places along NH-24, Ghaziabad, Uttar Pradesh.  Kindly give definite timeframe for that for which we all will be highly grateful to you.

 

3.      A Bench of Chief Justice N V Ramana and Justice Pradeep Nandrajog of the Delhi High Court in September, 2013 on a PIL filed by a resident of Vaishali, Ghaziabad (Shri Mohan Singh) regarding allowing Public Transport on NH-24 between Delhi and Uttar Pradesh [News article published in The Time of India dated 20th September, 2013 : "PIL SEEKS CITY BUSSES ON NH-24 : Link – http://timesofindia.indiatimes.com/city/delhi/PIL-seeks-city-buses-on-NH-24/articleshow/22774932.cms] directed in their interim order as under :-

 

"Direct the Respondents (State Governments of Delhi and Uttar Pradesh) to undertake the process of reviewing the list of routes under the Reciprocal Common Transport Agreement, 2008 keeping in view the development of residential colonies in Ghaziabad".

 

4.      In addition to above, kindly also refer to four letters dated 8th May, 2014 (two letters) and 10th September, 2014 (Reminder-1 : two letters) [copies of all the four letters are attached for information, perusal and further necessary action please] received from the Director (Tech.), National Capital Region Planning Board [Ministry of Urban Development], First Floor, Core – IV B, India Habitat Centre, Lodhi Road, New Delhi – 110003 addressed to the concerned authorities for examination and appropriate action at the earliest.

 

5.      It is also requested that instructions to the concerned authorities may please be issued for making Bus Stands (Bus Stops) on both sides of NH-24, Ghaziabad, Uttar Pradesh at the following places :-

 

(a)     Mahagunpuram Gate, NH-24, Mehrauli, Ghaziabad;

(b)     Columbia Asia Hospital, NH-24, Ghaziabad;

(c)     Lal Kuan, NH-24, Ghaziabad;

(d)     ABES Engineering College/Crossing Republic, NH-24;

(e)     Vijay Nagar Bypass, NH-24, Ghaziabad;

(f)      Siddhartha Vihar, NH-24, Ghaziabad;

(g)     Sector 63, NOIDA Crossing, NH-24, Ghaziabad;

(h)     Sector 62, NOIDA Crossing, NH-24, Ghaziabad;

(j)      CISF Crossing, Indirapuram, NH-24, Ghaziabad;

(k)     Sarojini Naidu Marg, NH-24, Ghaziabad;

(l)      Gaur Green City, Indirapuram, NH-24, Ghaziabad; and

(m)    UP Gate Police Station, NH-24, Ghaziabad.

 

6.      There are Bus Stands (Bus Stops) already there made by the concerned authorities on the side of Delhi along the Bus Route requested from Mehrauli Railway Station, NH-24, Ghaziabad to Shivaji Stadium, Connaught Place, Delhi/New Delhi Railway Station and Back.

 

7.      Ghaziabad, Uttar Pradesh is already an 'NCR (National Capital Region) City' since 1985 and the cities which comes under 'NCR' should have all the same common excellent facilities/infrastructure, like Excellent Roads/Widened Highways connected with Delhi and other NCR Cities; Common Transport System [Bus (DTC, UPSRTC, Autos, taxis, cabs, etc), Rail, Metro Extensions, etc) with Delhi and other NCR Cities; Safe Drinking Water for all; Sewer Connections for all; 24 Hour Electricity for all; etc.  Also, on 27 August 2015, Central Government released list of 98 Smart Cities which also includes Ghaziabad, Uttar Pradesh as a 'Smart City'.  Smart City 'Ghaziabad, Uttar Pradesh' will realize the dream of the perfect life.  The motive of each Smart City is one to accelerate economic growth and provide a better life to the citizens of the Smart City which includes sufficient water supply/water management; 24 hours power; affordable housing; pure climate; sanitation; waste management; sewer connections; better public transport (road, rail, metro, autos, taxis, cabs etc); digitization, e-governance; e-hospital (medicine, providing treatment and medical advice online, via the internet and smartphones make people aware of diseases); improved traffic; civil protection; education; health, etc.

 

8.      Ghaziabad, Uttar Pradesh is an 'NCR City' since 1985 through 'The National Capital Region Planning Board Act, 1985' published in 'The Gazette of India' on 11th February, 1985 and now it is also declared as a 'Smart City' by the Central Government on 27 August 2015, it should have all the excellent facilities as mentioned in Para 7 above for all the residents residing in Ghaziabad, Uttar Pradesh.

 

9.      The following reply received by me from the Office of Hon'ble Chief Minister, Government of Uttar Pradesh, Lucknow on the above subject, as under:-

 

"Sir/Madam ANAND SHARMA , your letter to Hon'ble CM has been sent to Principal Secretary/Secretary Transport".

 

10.    Kindly refer to reply dated 17th September, 2016 received by me from Col Tejandra Pal Tyagi, Vir Chakra, President, AOA Federation Ghaziabad to my request dated 16th September, 2016 on the above subject which he has addressed to the Transport Commissioner, Government of Uttar Pradesh, Lucknow and Chairman, UPSRTC, Government of Uttar Pradesh, Lucknow for further necessary action, as under:-

 

"Jai Hind, The letter  written by Shri Anand Kumar Sharma is so exhaustive, so convincing, so analytical and with so much of perseverance, that any Officer at the helm of affairs, would have easily approved additional city bus route from Mehrauli, Ghaziabad to New Delhi Railway Station forthwith. In fact such a proposal ought to have come from the local administration.  I on behalf of the organisations mentioned below request you to kindly accord approval in principle immediately and implementation at the earliest of the city Bus from Mehrauli, NH-24, Ghaziabad to New Delhi Railway Station.  We will raise such issues now onwards at different forums".

 

11.    In view of the above, you are, once again, requested to kindly sanction the above requested UPSRTC Bus Route from Mehrauli Railway Station, NH-24, Ghaziabad to Shivaji Stadium, Connaught Place, Delhi/New Delhi Railway Station and Back.  Bus Stands (Bus Stops) may also please be got made at the twelve places as mentioned at Para 5 (a) to (m) above.  By sanctioning this Bus Route/Bus Stands (Bus Stops), you will help millions of residents residing along NH-24 Corridor for which they all would be highly obliged to you. 

 

12.    Kindly acknowledge and confirm.

 

Regards,

Anand Kumar Sharma

Date :  29th January, 2017.

Address : Flat No. 1106, 11th Floor, Riddhi Block, Mahagunpuram, NH-24, Mehrauli, Ghaziabad – 201002, Uttar Pradesh.

 

AttachmentsCopies of four letters dated 8th May, 2014 (two letters) and 10th September, 2014 (Reminder-1 : two letters) of National Capital Region Planning Board (NCRPB) [Ministry of Urban Development], New Delhi.

 

Copy for information and further necessary action (for requests / directions, etc to the concerned authorities) to :-

 

1.      Hon'ble Minister of State for External Affairs / Overseas Indian Affairs and Hon'ble Member of Parliament (Lok Sabha : Ghaziabad Constituency), 2/27, Raj Nagar, Ghaziabad, Uttar Pradesh.  Kindly acknowledge and confirm.

 

2.      Hon'ble Chief Minister of Uttar Pradesh, Lucknow, Uttar Pradesh.  Many thanks for forwarding my request on the above subject to 'Principal Secretary/Secretary Transport, Government of Uttar Pradesh' for further necessary action.  Kindly acknowledge and confirm.

 

3.      Chief Secretary, Government of Uttar Pradesh, Lucknow – 226001, Uttar Pradesh.  Kindly acknowledge and confirm.

 

4.      Member Secretary, National Capital Region Planning Board (Ministry of Urban Development), Core–IV B, First Floor, India Habitat Centre, Lodhi Road, New Delhi – 110003.  Many thanks for forwarding my requests on the above subject on 8th May, 2014 and 10th September, 2014 (Reminder-1) to the concerned Officers of Government of Uttar Pradesh & UPSRTC, Lucknow and Government of NCT – Delhi & DTC, New Delhi for examination and appropriate action.  Kindly acknowledge and confirm. 

 

5.      Principal Secretary (Housing and Urban Planning Department), Govternment of Uttar Pradesh, Bapu Bhawan, Vidhan Sabha Marg, Lucknow – 226001, Uttar Pradesh.  Kindly acknowledge and confirm.

 

6.      President / General Secretary / Executive Members of Mahagunpuram Apartment Owners Association (MP-AOA) [Regd.] of Mahagunpuram, NH-24, Mehrauli, Ghaziabad, Uttar Pradesh – 201002.  You are also kindly requested to write on the similar lines as it will help in speedy implementation of the same.  Kindly acknowledge and confirm.

 

7.      President, Apartment Owners Associations Federation Ghaziabad (AOAFG) [Regd], Registered Head Office : 133 – B, Model Town East, Ghaziabad – 201009, Uttar Pradesh.  Many thanks for forwarding my request dated 16th September, 2016 on 17th September, 2016 to the Transport Commissioner, Government of Uttar Pradesh, Lucknow and Chairman, UPSRTC, Government of Uttar Pradesh, Lucknow for further necessary action on priority.  Kindly acknowledge and confirm.

 




__._,_.___

Attachment(s) from anasee2162@yahoo.in [MahagunpuramRWA] | View attachments on the web

2 of 2 Photo(s)


Posted by: anasee2162@yahoo.in


-------------AAAAAAAAAAA-----------------------





__,_._,___

Thursday, January 26, 2017

[Mahagunpuram] THANKS LETTER FOR PLACING THE ORDER FOR THE INSTALLATION OF ONE MORE LIFT (THIRD LIFT) WITH ANTI RESCUE DEVICE [ARD] FOR ALL THE BLOCKS (TOWERS) OF MAHAGUNPURAM, NH-24, MEHRAULI, GHAZIABAD – 201002, UTTAR PRADESH.



THANKS LETTER FOR PLACING THE ORDER FOR THE INSTALLATION OF ONE MORE LIFT (THIRD LIFT) WITH ANTI RESCUE DEVICE [ARD] FOR ALL THE BLOCKS (TOWERS) OF MAHAGUNPURAM, NH-24, MEHRAULI, GHAZIABAD – 201002, UTTAR PRADESH.

 

---------- Forwarded message ----------

From :  Anand Kumar Sharma <anasee2162@gmail.com>

Date :  Thu, Jan 26, 2017 at 10:20 PM

Subject :  THANKS LETTER FOR PLACING THE ORDER FOR THE INSTALLATION OF ONE MORE LIFT (THIRD LIFT) WITH ANTI RESCUE DEVICE [ARD] FOR ALL THE BLOCKS (TOWERS) OF MAHAGUNPURAM, NH-24, MEHRAULI, GHAZIABAD – 201002, UTTAR PRADESH.

 

To :  ssingh@drbuildwell.com, customercare@mahagunindia.com, info@mahagunindia.com, info.mahagunindia@gmail.com, marketing@mahagunindia.com, mahagun@gmail.com, scsharma@mahagunindia.com, mayank.fbd@gmail.com, handingover@mahagunindia.com, aniljain.mahagun@gmail.com, ajeetchaubey.csk@gmail.com, mahagunpuram.csk@gmail.com

Cc :  icjindal@gmail.com, ergauravdwivedi@gmail.com, tosaurabh7@yahoo.co.in, gargparveen1971@yahoo.co.in, uttam.singh@kanbaninfosystem.com, jks.gzb@gmail.com, cyberarvind@yahoo.com, er.arvindtiwari@gmail.com, saxena111@gmail.com, ajaykaushik74@yahoo.com, aoafedgzb2015@gmail.com, rwafedgzb6@gmail.com, tptyagi@gmail.com, mahagunpuramaoa@gmail.com, sheetal_tyg@yahoo.co.in, sheetaltyagi1981@gmail.com, surjeet_cavs@yahoo.co.uk, smarttapan@yahoo.com, smartone.tapan@gmail.com, gauravvanshi@yahoo.com, tanweer1008@yahoo.com, avdheshks@gmail.com, vnrsa@yahoo.com, subhashchandraverma@gmail.com

To

 

Vice President (Facility Management) / Director,

Mahagun Group, Mahagun India Private Limited

(Mahagun Real Estate Private Limited),

Corporate Office : Office No. 44, Tower – B,

4th Floor, Corenthum, Sector – 62,

NOIDA – 201309, Uttar Pradesh.

 

SUBJECT :  THANKS LETTER FOR PLACING THE ORDER FOR THE INSTALLATION OF ONE MORE LIFT (THIRD LIFT) WITH ANTI RESCUE DEVICE [ARD] FOR ALL THE BLOCKS (TOWERS) OF MAHAGUNPURAM, NH-24, MEHRAULI, GHAZIABAD – 201002, UTTAR PRADESH.

 

Respected Sir,

 

1.      Kindly refer to my requests dated 25th April, 2015; 9th May, 2015; 15th June, 2015; 4th July, 2015; 5th August, 2015; Speed Post Letter dated 20th September, 2015; 5th December, 2015; 19th March, 2016; 25th May, 2016; 1st July, 2016; 12th August, 2016; 2nd September, 2016; Thanks Letter dated 14th September, 2016; 29th October, 2016 and 22nd November, 2016 on the above subject.

 

2.      Many thanks for confirming on 14th September, 2016 the approval of one more Lift (Third Lift) with Anti Rescue Device [ARD] for all the Blocks (Towers) of Mahagunpuram, NH-24, Mehrauli, Ghaziabad.

 

3.      Also, many thanks for placing the order for the installation of one more lift (Third Lift) with ARD for all the Blocks (Towers) of Mahagunpuram, NH-24, Mehrauli, Ghaziabad.  We all are highly grateful to you for that.

 

4.      In view of the above, it is hoped that the Third Lift with Anti Rescue Device (ARD) in all the Blocks (Towers) of Mahagunpuram, NH-24, Mehrauli, Ghaziabad will be installed at the earliest.

 

5.      Kindly acknowledge and confirm.

 

Regards.

 

Anand Kumar Sharma

Date :  26th January, 2017.

Address : Flat No. 1106, Riddhi Block (Tower), Mahagunpuram, NH-24, Mehrauli, Ghaziabad – 201002, Uttar Pradesh.

 

Copy to :-

 

1.      President / General Secretary / Executive Members of Mahagunpuram Apartment Owners Association (MP-AOA) [Regd] of Mahagunpuram, NH-24, Mehrauli, Ghaziabad, Uttar Pradesh – 201002.  Many thanks for further pursuing the above subject matter.

 

2.      President, Apartment Owners Associations Federation Ghaziabad (AOAFG) [Regd], Registered Head Office : 133 – B, Model Town East, Ghaziabad – 201009, Uttar Pradesh.  Many thanks for further pursuing the above subject matter.





__._,_.___

Posted by: anasee2162@yahoo.in


-------------AAAAAAAAAAA-----------------------





__,_._,___

Friday, January 13, 2017

[Mahagunpuram] Request to start the work of 14 – Lane Delhi – Meerut Expressway Project [Widening of NH–24 from UP Gate (Delhi – UP Border) to Dasna and from UP Gate (Delhi – UP Border) to Meerut via Dasna].

Request to start the work of 14 – Lane Delhi – Meerut Expressway Project [Widening of NH–24 from UP Gate (Delhi – UP Border) to Dasna and from UP Gate (Delhi – UP Border) to Meerut via Dasna].

The following positive reply dated 12 January 2017 has been received by me from National Highways Authority of India (NHAI) on the above subject, as under:-

"In this regard, it is to inform that the widening work of NH-24 from Delhi to Hapur is being implemented in three packages.

The work has already been awarded for first & third packages i.e. Ring Road to Delhi/U.P. Border & Dasna to Hapur. The construction work for these 2 packages has commenced and is scheduled for completion within 910 days.

For second package between Delhi/U.P. Border to Dasna, bids have been received on 03.10.2016 and are under evaluation. Efforts are being made to complete the entire project between Delhi to Hapur by December, 2018.

Further, new greenfield expressway is planned for construction from Dasna to Meerut and bidding process has been taken up for the same."

------------------------------------
Posted by: anasee2162@yahoo.in
------------------------------------

-------------AAAAAAAAAAA-----------------------

------------------------------------

Yahoo Groups Links

<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/MahagunpuramRWA/

<*> Your email settings:
Individual Email | Traditional

<*> To change settings online go to:
http://groups.yahoo.com/group/MahagunpuramRWA/join
(Yahoo! ID required)

<*> To change settings via email:
MahagunpuramRWA-digest@yahoogroups.com
MahagunpuramRWA-fullfeatured@yahoogroups.com

<*> To unsubscribe from this group, send an email to:
MahagunpuramRWA-unsubscribe@yahoogroups.com

<*> Your use of Yahoo Groups is subject to:
https://info.yahoo.com/legal/us/yahoo/utos/terms/

Re: [Mahagunpuram] Request to start the work after Foundation Laying Stone by Hon=?UTF-8?Q?=E2=80=99?=b le Prime Minister of India on 31st Decemb er, 2015 of 14 – Lane Delhi – Meerut Express way Project [Widening of NH=?UTF-8?Q?=E2=80=93?=24 from UP Ga te (Delhi – UP Border) to Dasna and from UP Gate (Delhi – UP Border) to Meerut via Da sna] on Hybrid Annuity Model.

Request to start the work of 14 – Lane Delhi – Meerut Expressway Project [Widening of NH–24 from UP Gate (Delhi – UP Border) to Dasna and from UP Gate (Delhi – UP Border) to Meerut via Dasna].

The following positive reply dated 12 January 2017 has been received by me from National Highways Authority of India (NHAI) on the above subject, as under:-

"In this regard, it is to inform that the widening work of NH-24 from Delhi to Hapur is being implemented in three packages.

The work has already been awarded for first & third packages i.e. Ring Road to Delhi/U.P. Border & Dasna to Hapur. The construction work for these 2 packages has commenced and is scheduled for completion within 910 days.

For second package between Delhi/U.P. Border to Dasna, bids have been received on 03.10.2016 and are under evaluation. Efforts are being made to complete the entire project between Delhi to Hapur by December, 2018.

Further, new greenfield expressway is planned for construction from Dasna to Meerut and bidding process has been taken up for the same."

------------------------------------
Posted by: anasee2162@yahoo.in
------------------------------------

-------------AAAAAAAAAAA-----------------------

------------------------------------

Yahoo Groups Links

<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/MahagunpuramRWA/

<*> Your email settings:
Individual Email | Traditional

<*> To change settings online go to:
http://groups.yahoo.com/group/MahagunpuramRWA/join
(Yahoo! ID required)

<*> To change settings via email:
MahagunpuramRWA-digest@yahoogroups.com
MahagunpuramRWA-fullfeatured@yahoogroups.com

<*> To unsubscribe from this group, send an email to:
MahagunpuramRWA-unsubscribe@yahoogroups.com

<*> Your use of Yahoo Groups is subject to:
https://info.yahoo.com/legal/us/yahoo/utos/terms/

Thursday, January 12, 2017

Re: [Mahagunpuram] Request to start the work after Foundation Laying Stone by Hon=?UTF-8?Q?=E2=80=99?=ble Prime Minister of India on 31st December, 2015 of 14 – Lane Delhi – Meerut Expressway Project [Widening of NH=?UTF-8?Q?=E2=80=93?=24 from UP Gate (Delhi – UP Border) to Dasna and from UP Gate (Delhi – UP Border) to Meerut via Dasna] on Hybrid Annuity Model.



Request to start the work after Foundation Laying Stone by Hon'ble Prime Minister of India on 31st December, 2015 of 14 – Lane Delhi – Meerut Expressway Project [Widening of NH–24 from UP Gate (Delhi – UP Border) to Dasna and from UP Gate (Delhi – UP Border) to Meerut via Dasna] on Hybrid Annuity Model.

The following reply dated 12 January 2017 received from National Highways Authority of India (NHAI) on the above subject, as under:-

"This has reference to trailing e-mail regarding the above mentioned subject.

In this regard, it is to inform that the widening work of NH-24 from Delhi to Hapur is being implemented in three packages.  The work has already been awarded for first & third packages i.e. Ring Road to Delhi/U.P. Border & Dasna to Hapur.  The construction work for these 2 packages has commenced and is scheduled for completion within 910 days.  For second package between Delhi/U.P. Border to Dasna, bids have been received on 03.10.2016 and are under evaluation.  Efforts are being made to complete the entire project between Delhi to Hapur by Dec.-2018.  Further, new greenfield expressway is planned for construction from Dasna to Meerut and bidding process has been taken up for the same."

On 11 Jan 2017 21:13, "anasee2162@yahoo.in [MahagunpuramRWA]" <MahagunpuramRWA@yahoogroups.com> wrote:
[Attachment(s) from anasee2162@yahoo.in [MahagunpuramRWA] included below]

Request to start the work after Foundation Laying Stone by Hon'ble Prime Minister of India on 31st December, 2015 of 14 – Lane Delhi – Meerut Expressway Project [Widening of NH–24 from UP Gate (Delhi – UP Border) to Dasna and from UP Gate (Delhi – UP Border) to Meerut via Dasna] on Hybrid Annuity Model.


All residents residing along NH-24, Ghaziabad; Mahagunpuram, NH-24, Mehrauli, Ghaziabad; MP-AOA (Mahagunpuram Apartment Owners Association); AOA Federation Ghaziabad (Regd); AOAs/RWAs of Housing Projects along NH-24, Ghaziabad are also requested to send their requests on the above subject in the following way as it will help in speedy implementation of the same:-


---------- Forwarded message ----------


From :  Anand Kumar Sharma <anasee2162@gmail.com>


Date :  Wed, Jan 11, 2017 at 8:11 PM


Subject :  Request to start the work after Foundation Laying Stone by Hon'ble Prime Minister of India on 31st December, 2015 of 14 – Lane Delhi – Meerut Expressway Project [Widening of NH–24 from UP Gate (Delhi – UP Border) to Dasna and from UP Gate (Delhi – UP Border) to Meerut via Dasna] on Hybrid Annuity Model.


To :  nitin.gadkari@nic.in, secy-road@nic.in, Vijay Chhibber <secyrth@gmail.com>, vaibhav.dange@nic.in, rajgopal.sharma@nic.in, wadekar11@yahoo.co.in, sandeepkumar.rth@nic.in, rohit.kumar@nic.in, rajkumar.arora@nic.in, pradeep.rawal@nic.in, chairman@nhai.org, memberppp@nhai.org, memberfinance@nhai.org, memberadmin@nhai.org, Atul Kumar <atulkumar@nhai.org>, akmarwaha@nhai.org, mkjain@nhai.org, anandksingh@nhai.org, prasadranjeeta@nhai.org, pawars@nhai.org, rajeevyadav@nhai.org, c.ekambaram@nic.in, TT Negi <negitt4@gmail.com>, jkgoyal@nhai.org


Cc: "Gen V. K. Singh" <eloksabhagzb@gmail.com>, MOS VKS <mosvkso@mea.gov.in>, vksingh.mp@sansad.nic.in, ncrpb-ms@nic.in, ncrpb-dr@nic.in, ncrpb-jd1@nic.in, ncrpb-aa02@nic.in, ncrcellup@gmail.com, ISHWAR CHAND JINDAL <icjindal@gmail.com>, Gaurav Dwivedi <ergauravdwivedi@gmail.com>, Saurabh Bansal <tosaurabh7@yahoo.co.in>, gargparveen1971@yahoo.co.in, RWA uttam g <uttam.singh@kanbaninfosystem.com>, Jatinder kumar <jks.gzb@gmail.com>, cyberarvind@yahoo.com, "arvind.amity29@gmail.com" <arvind.amity29@gmail.com>, Arvind Tiwari <er.arvindtiwari@gmail.com>, "saxena111@gmail.com" <saxena111@gmail.com>, ajaykaushik74@yahoo.com, "sheetal_tyg@yahoo.co.in" <sheetal_tyg@yahoo.co.in>, Sheetal Tyagi <sheetaltyagi1981@gmail.com>, surjeet singh <surjeet_cavs@yahoo.co.uk>, mahagunpuram aoa <mahagunpuramaoa@gmail.com>, TAPAN KUMAR <smarttapan@yahoo.com>, TAPAN panigrahi <smartone.tapan@gmail.com>, gauravvanshi@yahoo.com, tanweer1008@yahoo.com, Avdhesh Kumar <avdheshks@gmail.com>, vnrsa@yahoo.com, AOA Federation Ghaziabad <aoafedgzb2015@gmail.com>, Tejandra Pal Tyagi <tptyagi@gmail.com>, RWA Federation Gzb <rwafedgzb6@gmail.com>


To


Hon'ble Minister for Road Transport and Highways,

Ministry of Road Transport and Highways (MoRT&H)

Transport Bhawan,

1, Parliament Street,

New Delhi – 110001.


Chairman,

National Highways Authority of India,

G 5 & 6, Sector – 10, Dwarka,

New Delhi – 110075


Subject :  Request to start the work after Foundation Laying Stone by Hon'ble Prime Minister of India on 31st December, 2015 of 14 – Lane Delhi – Meerut Expressway Project [Widening of NH–24 from UP Gate (Delhi – UP Border) to Dasna and from UP Gate (Delhi – UP Border) to Meerut via Dasna] on Hybrid Annuity Model.


Respected Sir,


1.       Kindly refer to my requests dated 6th January, 2013; 9th

January, 2013; 7th May, 2013, 8th May, 2013; 28th May, 2013; 17th August, 2014; 23rdAugust, 2014; 8th November, 2014; 6th December, 2014; 26th December, 2014; 28th April, 2015; 24th June, 2015; 13th October, 2015; 26th October, 2015; 21st November, 2015; 7th May, 2016 and 14th August, 2016 on the above subject.  The above subject matter is pending since long.  I am, once again, requesting for the same.


2.       Kindly refer to replies dated 29th May, 2013; 30th May, 2013 and 28th August, 2014 received from Ministry of Road Transport and Highways (MoRT&H) / National Highways Authority of India (NHAI) on the above subject.


3.       Kindly refer to Requests for Proposal (Letters of Invitation) dated 4th March, 2014; 27th July, 2015; 8thSeptember, 2015; 9th October, 2015; 23rd October, 2015; 9th November, 2015; 27th November, 2015 and 6th May, 2016 of National Highways Authority of India (Ministry of Road Transport and Highways), New Delhi on the above subject.


4.       Hon'ble Prime Minister of India had laid the foundation stone of 14 – Lane Delhi – Meerut Expressway Project [Widening of NH–24 from UP Gate (Delhi – UP Border) to Dasna and from UP Gate (Delhi – UP Border) to Meerut via Dasna] on 31st December, 2015 from Plot No. A – 33, Sector – 62, NOIDA, Uttar Pradesh (copies of photos attached of the function).  The special invitees for this function (foundation laying stone of 14 – Lane Delhi – Meerut Expressway Project by Hon'ble Prime Minister of India on 31st December, 2015) were Hon'ble Minister for Road Transport and Highways; Hon'ble Minister of State (Independent Charge) for Culture, Tourism & Civil Aviation & Hon'ble Member of Parliament (Lok Sabha : Gautam Buddha Nagar Constituency); Hon'ble Minister of State for Road Transport and Highways; Hon'ble Minister of State for External Affairs / Overseas Indian Affairs & Hon'ble Member of Parliament (Lok Sabha : Ghaziabad Constituency) and other important VIPs.


5.       It seems that, even after the Hon'ble Prime Minister of India had laid the foundation laying stone on 31st December, 2015 (more than one year ago) of 14 – Lane Delhi – Meerut Expressway Project from Delhi to Meerut (via UP Gate, NH-24, Ghaziabad / Mahagunpuram, NH-24 / Dasna), the work relating to it has yet to be started.


6.       In view of the above, you are requested to kindly instruct the

concerned authorities to get the work relating to 14 – Lane Delhi –

Meerut Expressway Project [widening of NH-24 from UP Gate (Delhi-UP Border) to Dasna and from UP Gate (Delhi-UP Border) to Meerut via Dasna] started at the earliest as already considerable delay has happened in this regard.  We all will be highly grateful to you for that.


7.       Kindly acknowledge and confirm.


Regards,


Anand Kumar Sharma

Date :  11th January, 2017.

Address : Flat No. 1106, 11th Floor, Riddhi Block, Mahagunpuram,

NH-24, Mehrauli, Ghaziabad – 201002, Uttar Pradesh.


Attachments : As stated above.


Copy for information and further necessary action to :-


1. Hon'ble Minister of State for External Affairs / Overseas Indian Affairs and Hon'ble Member of Parliament (Lok Sabha : Ghaziabad Constituency), 2/27, Raj Nagar, Ghaziabad - 201002, Uttar Pradesh.  Kindly acknowledge and confirm.


2. Member Secretary, National Capital Region Planning Board

(Ministry of Urban Development), Core–IV B, First Floor, India Habitat Centre, Lodhi Road, New Delhi – 110003].  Kindly acknowledge and confirm.


3. Commissioner, NCR  Planning & Monitoring Cell (UP), Town & Country Planning Department, Navyug Market, Second Floor, Nagar Nigam Bhawan (Commercial Building), Ghaziabad, Uttar Pradesh – 201001.  Kindly acknowledge and confirm.


4. President / General Secretary / Executive Members of Mahagunpuram Apartment Owners Association (MP-AOA) [Regd.] of Mahagunpuram, NH-24, Mehrauli, Ghaziabad, Uttar Pradesh – 201002.  You are also kindly requested to write on the similar lines as it will help in speedy implementation of the same.   Kindly acknowledge and confirm.


5. President, Apartment Owners Associations Federation Ghaziabad (AOAFG) [Regd] : 133 – B, Model Town East, Ghaziabad – 201009, Uttar Pradesh.  You are also kindly requested to write on the similar lines as it will help in speedy implementation of the same.  Kindly acknowledge and confirm.








__._,_.___

Posted by: ANAND KUMAR SHARMA <anasee2162@yahoo.in>


-------------AAAAAAAAAAA-----------------------





__,_._,___

Wednesday, January 11, 2017

[Mahagunpuram] Request to start the work after Foundation Laying Stone by Hon’ble Prime Minister of India on 31st December, 2015 of 14 – Lane Delhi – Meerut Expressway Project [Widening of NH–24 from UP Gate (Delhi – UP Border) to Dasna and from UP Gate (Delhi – UP Border) to Meerut via Dasna] on Hybrid Annuity Model. [4 Attachments]

[Attachment(s) from anasee2162@yahoo.in [MahagunpuramRWA] included below]

Request to start the work after Foundation Laying Stone by

Hon'ble Prime Minister of India on 31st December, 2015 of 14 – Lane Delhi – Meerut Expressway Project [Widening of NH–24 from UP Gate (Delhi – UP Border) to Dasna and from UP Gate (Delhi – UP Border) to Meerut via Dasna] on Hybrid Annuity Model.


All residents residing along NH-24, Ghaziabad; Mahagunpuram, NH-24, Mehrauli, Ghaziabad; MP-AOA (Mahagunpuram Apartment Owners Association); AOA Federation Ghaziabad (Regd); AOAs/RWAs of Housing Projects along NH-24, Ghaziabad are also requested to send their requests on the above subject in the following way as it will help in speedy implementation of the same:-


---------- Forwarded message ----------


From :  Anand Kumar Sharma <anasee2162@gmail.com>


Date :  Wed, Jan 11, 2017 at 8:11 PM


Subject :  Request to start the work after Foundation Laying Stone by Hon'ble Prime Minister of India on 31st December, 2015 of 14 – Lane Delhi – Meerut Expressway Project [Widening of NH–24 from UP Gate (Delhi – UP Border) to Dasna and from UP Gate (Delhi – UP Border) to Meerut via Dasna] on Hybrid Annuity Model.


To :  nitin.gadkari@nic.in, secy-road@nic.in, Vijay Chhibber <secyrth@gmail.com>, vaibhav.dange@nic.in, rajgopal.sharma@nic.in, wadekar11@yahoo.co.in, sandeepkumar.rth@nic.in, rohit.kumar@nic.in, rajkumar.arora@nic.in, pradeep.rawal@nic.in, chairman@nhai.org, memberppp@nhai.org, memberfinance@nhai.org, memberadmin@nhai.org, Atul Kumar <atulkumar@nhai.org>, akmarwaha@nhai.org, mkjain@nhai.org, anandksingh@nhai.org, prasadranjeeta@nhai.org, pawars@nhai.org, rajeevyadav@nhai.org, c.ekambaram@nic.in, TT Negi <negitt4@gmail.com>, jkgoyal@nhai.org


Cc: "Gen V. K. Singh" <eloksabhagzb@gmail.com>, MOS VKS <mosvkso@mea.gov.in>, vksingh.mp@sansad.nic.in, ncrpb-ms@nic.in, ncrpb-dr@nic.in, ncrpb-jd1@nic.in, ncrpb-aa02@nic.in, ncrcellup@gmail.com, ISHWAR CHAND JINDAL <icjindal@gmail.com>, Gaurav Dwivedi <ergauravdwivedi@gmail.com>, Saurabh Bansal <tosaurabh7@yahoo.co.in>, gargparveen1971@yahoo.co.in, RWA uttam g <uttam.singh@kanbaninfosystem.com>, Jatinder kumar <jks.gzb@gmail.com>, cyberarvind@yahoo.com, "arvind.amity29@gmail.com" <arvind.amity29@gmail.com>, Arvind Tiwari <er.arvindtiwari@gmail.com>, "saxena111@gmail.com" <saxena111@gmail.com>, ajaykaushik74@yahoo.com, "sheetal_tyg@yahoo.co.in" <sheetal_tyg@yahoo.co.in>, Sheetal Tyagi <sheetaltyagi1981@gmail.com>, surjeet singh <surjeet_cavs@yahoo.co.uk>, mahagunpuram aoa <mahagunpuramaoa@gmail.com>, TAPAN KUMAR <smarttapan@yahoo.com>, TAPAN panigrahi <smartone.tapan@gmail.com>, gauravvanshi@yahoo.com, tanweer1008@yahoo.com, Avdhesh Kumar <avdheshks@gmail.com>, vnrsa@yahoo.com, AOA Federation Ghaziabad <aoafedgzb2015@gmail.com>, Tejandra Pal Tyagi <tptyagi@gmail.com>, RWA Federation Gzb <rwafedgzb6@gmail.com>


To


Hon'ble Minister for Road Transport and Highways,

Ministry of Road Transport and Highways (MoRT&H)

Transport Bhawan,

1, Parliament Street,

New Delhi – 110001.


Chairman,

National Highways Authority of India,

G 5 & 6, Sector – 10, Dwarka,

New Delhi – 110075


Subject :  Request to start the work after Foundation Laying Stone by Hon'ble Prime Minister of India on 31st December, 2015 of 14 – Lane Delhi – Meerut Expressway Project [Widening of NH–24 from UP Gate (Delhi – UP Border) to Dasna and from UP Gate (Delhi – UP Border) to Meerut via Dasna] on Hybrid Annuity Model.


Respected Sir,


1.       Kindly refer to my requests dated 6th January, 2013; 9th

January, 2013; 7th May, 2013, 8th May, 2013; 28th May, 2013; 17th August, 2014; 23rdAugust, 2014; 8th November, 2014; 6th December, 2014; 26th December, 2014; 28th April, 2015; 24th June, 2015; 13th October, 2015; 26th October, 2015; 21st November, 2015; 7th May, 2016 and 14th August, 2016 on the above subject.  The above subject matter is pending since long.  I am, once again, requesting for the same.


2.       Kindly refer to replies dated 29th May, 2013; 30th May, 2013 and 28th August, 2014 received from Ministry of Road Transport and Highways (MoRT&H) / National Highways Authority of India (NHAI) on the above subject.


3.       Kindly refer to Requests for Proposal (Letters of Invitation) dated 4th March, 2014; 27th July, 2015; 8thSeptember, 2015; 9th October, 2015; 23rd October, 2015; 9th November, 2015; 27th November, 2015 and 6th May, 2016 of National Highways Authority of India (Ministry of Road Transport and Highways), New Delhi on the above subject.


4.       Hon'ble Prime Minister of India had laid the foundation stone of 14 – Lane Delhi – Meerut Expressway Project [Widening of NH–24 from UP Gate (Delhi – UP Border) to Dasna and from UP Gate (Delhi – UP Border) to Meerut via Dasna] on 31st December, 2015 from Plot No. A – 33, Sector – 62, NOIDA, Uttar Pradesh (copies of photos attached of the function).  The special invitees for this function (foundation laying stone of 14 – Lane Delhi – Meerut Expressway Project by Hon'ble Prime Minister of India on 31st December, 2015) were Hon'ble Minister for Road Transport and Highways; Hon'ble Minister of State (Independent Charge) for Culture, Tourism & Civil Aviation & Hon'ble Member of Parliament (Lok Sabha : Gautam Buddha Nagar Constituency); Hon'ble Minister of State for Road Transport and Highways; Hon'ble Minister of State for External Affairs / Overseas Indian Affairs & Hon'ble Member of Parliament (Lok Sabha : Ghaziabad Constituency) and other important VIPs.


5.       It seems that, even after the Hon'ble Prime Minister of India had laid the foundation laying stone on 31st December, 2015 (more than one year ago) of 14 – Lane Delhi – Meerut Expressway Project from Delhi to Meerut (via UP Gate, NH-24, Ghaziabad / Mahagunpuram, NH-24 / Dasna), the work relating to it has yet to be started.


6.       In view of the above, you are requested to kindly instruct the

concerned authorities to get the work relating to 14 – Lane Delhi –

Meerut Expressway Project [widening of NH-24 from UP Gate (Delhi-UP Border) to Dasna and from UP Gate (Delhi-UP Border) to Meerut via Dasna] started at the earliest as already considerable delay has happened in this regard.  We all will be highly grateful to you for that.


7.       Kindly acknowledge and confirm.


Regards,


Anand Kumar Sharma

Date :  11th January, 2017.

Address : Flat No. 1106, 11th Floor, Riddhi Block, Mahagunpuram,

NH-24, Mehrauli, Ghaziabad – 201002, Uttar Pradesh.


Attachments : As stated above.


Copy for information and further necessary action to :-


1. Hon'ble Minister of State for External Affairs / Overseas Indian Affairs and Hon'ble Member of Parliament (Lok Sabha : Ghaziabad Constituency), 2/27, Raj Nagar, Ghaziabad - 201002, Uttar Pradesh.  Kindly acknowledge and confirm.


2. Member Secretary, National Capital Region Planning Board

(Ministry of Urban Development), Core–IV B, First Floor, India Habitat Centre, Lodhi Road, New Delhi – 110003].  Kindly acknowledge and confirm.


3. Commissioner, NCR  Planning & Monitoring Cell (UP), Town & Country Planning Department, Navyug Market, Second Floor, Nagar Nigam Bhawan (Commercial Building), Ghaziabad, Uttar Pradesh – 201001.  Kindly acknowledge and confirm.


4. President / General Secretary / Executive Members of Mahagunpuram Apartment Owners Association (MP-AOA) [Regd.] of Mahagunpuram, NH-24, Mehrauli, Ghaziabad, Uttar Pradesh – 201002.  You are also kindly requested to write on the similar lines as it will help in speedy implementation of the same.   Kindly acknowledge and confirm.


5. President, Apartment Owners Associations Federation Ghaziabad (AOAFG) [Regd] : 133 – B, Model Town East, Ghaziabad – 201009, Uttar Pradesh.  You are also kindly requested to write on the similar lines as it will help in speedy implementation of the same.  Kindly acknowledge and confirm.





__._,_.___

Attachment(s) from anasee2162@yahoo.in [MahagunpuramRWA] | View attachments on the web

4 of 4 Photo(s)


__,_._,___