Tuesday, July 29, 2014

Re: [Mahagunpuram] IGL SURVEY COMPLETED.



All credit goes to you sir...


On Tuesday, 29 July 2014 2:33 PM, "ANAND KUMAR SHARMA anasee2162@yahoo.in [MahagunpuramRWA]" <MahagunpuramRWA@yahoogroups.com> wrote:


 

IGL survey work has been competed.  We decided the final route of gas pipe line.  IGL will submit the detail project plan within 2 days to MP-AOA.  After that we will refer that report to Mahagun for constructional modification.  IGL promised us that, after modification, they will complete their work within 2 months.  Hope for the best.

Sent from Samsung Mobile




__._,_.___

Posted by: ashish srivastava <ashish_cj@yahoo.co.in>


-------------AAAAAAAAAAA-----------------------





__,_._,___

[Mahagunpuram] IGL SURVEY COMPLETED.




IGL survey work has been competed.  We decided the final route of gas pipe line.  IGL will submit the detail project plan within 2 days to MP-AOA.  After that we will refer that report to Mahagun for constructional modification.  IGL promised us that, after modification, they will complete their work within 2 months.  Hope for the best.

Sent from Samsung Mobile


__._,_.___

Posted by: ANAND KUMAR SHARMA <anasee2162@yahoo.in>


-------------AAAAAAAAAAA-----------------------





__,_._,___

Sunday, July 27, 2014

Re: [Mahagunpuram] 3 BHK FLAT TOBE PURCHASE IN PHASE 1



Dear All

One of my friend is looking for buying 3 bhk flat in mahagunpuram phase-1,If any one is interested to sell the 3 bhk,may directly contract to him on his mobile no.9999106575(Mr.Dushyant Toamr). 

Jitendra Gupta





Get your own FREE website, FREE domain & FREE mobile app with Company email.  
Know More >


__._,_.___

Posted by: "Jitendra Gupta" <gupta.jitendra@rediffmail.com>


-------------AAAAAAAAAAA-----------------------





__,_._,___

Tuesday, July 22, 2014

[Mahagunpuram] 2 BHK + Study Room flat, 4th Floor on Rent in Mahagunpuram from August-14 Mahagunpuram, NH24, Ghaziabad.



Specification: - Newly Contructed Property - 11 Month Agreement. - Covered Basement Parking. - 2 Bedrooms + 1 Study room, 1 with Attached bathroom. - 1 Common bathroom - 3 Balconies. - Gymnasium. - Swimming Pool. Lights and Fans in all the room.

Wooden work in all 3 rooms with designer POP on Ceiling. Modular kitchen. - 24 hours Security. - Generator Backup in common areas and in flat as well.

 

Contact Details: Chhetrapal Singh 9811631535




__._,_.___

Posted by: cpinfotech@gmail.com


-------------AAAAAAAAAAA-----------------------





__,_._,___

Monday, July 21, 2014

[Mahagunpuram] GOOD NEWS : FINAL MEETING ON THURSDAY, THE 24TH JULY, 2014 AT 1500 HOURS (3.00 P.M.) AT IGL OFFICE, NATIONAL FERTILIZERS LIMITED, SECTOR – 24, NOIDA FOR SIGNING OF THE TRIPARTITE TECHNICAL AGREEMENT BETWEEN IGL, MAHAGUN GROUP {MIPL (MREPL) : BUILDER} AND MP–AOA REGARDING STARTING OF WORK FOR LAYING OF DOMESTIC PIPED NATURAL GAS (PNG) PIPELINES NETWORK AT MAHAGUNPURAM PHASE I, NH-24, MEHRAULI, GHAZIABAD – 201002 (UTTAR PRADESH).



GOOD NEWS : FINAL MEETING ON THURSDAY, THE 24TH JULY, 2014 AT 1500 HOURS (3.00 P.M.) AT IGL OFFICE, NATIONAL FERTILIZERS LIMITED, SECTOR – 24, NOIDA FOR SIGNING OF THE TRIPARTITE TECHNICAL AGREEMENT BETWEEN IGL, MAHAGUN GROUP {MIPL (MREPL) : BUILDER} AND  MP–AOA REGARDING STARTING OF WORK FOR LAYING OF DOMESTIC PIPED NATURAL GAS (PNG) PIPELINES NETWORK AT MAHAGUNPURAM PHASE I, NH-24, MEHRAULI, GHAZIABAD – 201002 (UTTAR PRADESH).

 

---------- Forwarded message ----------

From : Anand Sharma <anasee2162@gmail.com>

Date : Mon, Jul 21, 2014 at 8:54 PM

Subject : FINAL MEETING ON THURSDAY, THE 24TH JULY, 2014 AT 1500 HOURS (3.00 P.M.) AT IGL OFFICE, NATIONAL FERTILIZERS LIMITED, SECTOR – 24, NOIDA FOR SIGNING OF THE TRIPARTITE TECHNICAL AGREEMENT BETWEEN IGL, MAHAGUN GROUP {MIPL (MREPL) : BUILDER} AND MP–AOA REGARDING STARTING OF WORK FOR LAYING OF DOMESTIC PIPED NATURAL GAS (PNG) PIPELINES NETWORK AT MAHAGUNPURAM PHASE I, NH-24, MEHRAULI, GHAZIABAD – 201002 (UTTAR PRADESH).

 

To : "Sharma, Sonu" <sonu.sharma@igl.co.in>

Cc : "Gen V. K. Singh" <eloksabhagzb@gmail.com>, "Singh, Nahar" <nahar.singh@igl.co.in>, Vinod Kumar Dhaaka <vinod.dhaaka@igl.co.in>, "customercare.png@igl.co.in" <customercare.png@igl.co.in>, anshul@igl.co.in, nikhil.nangia@igl.co.in, manish25170@yahoo.co.in, surjeet singh <surjeet_cavs@yahoo.co.uk>, mahagunpuram aoa <mahagunpuramaoa@gmail.com>, SHEETAL TYAGI <sheetal_tyg@yahoo.co.in>, TAPAN KUMAR <smarttapan@yahoo.com>, Arvind Tiwari <arvind.amity29@gmail.com>, RWA uttam g <uttam.singh@kanbaninfosystem.com>, "dr_d_k_srivastava@yahoo.co.in" <dr_d_k_srivastava@yahoo.co.in>, Vaibhav Bhatnagar <vaibhavincontact@gmail.com>, Avdhesh Kumar <avdheshks@gmail.com>, Shailendra Saxena <saxena111@gmail.com>, ISHWAR CHAND JINDAL <icjindal@gmail.com>, kamal agarwal <agarwalkamal15@gmail.com>, sroy@mahagunindia.com, Dhiraj Jain <mahagun@gmail.com>, svarshney@mahagunindia.com, scsharma@mahagunindia.com, Mayank Aggarwal <mayank.fbd@gmail.com>, anil jain <aniljain.mahagun@gmail.com>, Needhi Majithia <handingover@mahagunindia.com>, AUDREY MAHAGUN <customercare@mahagunindia.com>, "info@mahagunindia.com" <info@mahagunindia.com>, Mahagun India <info.mahagunindia@gmail.com>, marketing@mahagunindia.com, Ajeet Chaubey <ajeetchaubey.csk@gmail.com>, Mahagun Puram <mahagunpuram.csk@gmail.com>

To

 

Ms. Sonu Sharma,

Additional Manager – PNG Marketing,

Indraprastha Gas Limited (IGL),

IGL Bhawan, Plot No. 4, 

Community Centre,

Sector 9,  R.K. Puram,

New Delhi – 110022.

( sonu.sharma@igl.co.in )

 

SUBJECT : FINAL MEETING ON THURSDAY, THE 24TH JULY, 2014 AT 1500 HOURS (3.00 P.M.) AT IGL OFFICE, NATIONAL FERTILIZERS LIMITED, SECTOR – 24, NOIDA FOR SIGNING OF THE TRIPARTITE TECHNICAL AGREEMENT BETWEEN IGL, MAHAGUN GROUP {MIPL (MREPL) : BUILDER} AND  MP–AOA REGARDING STARTING OF WORK FOR LAYING OF DOMESTIC PIPED NATURAL GAS (PNG) PIPELINES NETWORK AT MAHAGUNPURAM PHASE I, NH-24, MEHRAULI, GHAZIABAD – 201002 (UTTAR PRADESH).

 

Dear Madam,

 

1.         Kindly refer to my requests dated 12th April, 2013;  16th April, 2013;  21st April, 2013; 15th May, 2013; 9th June, 2013;  24th June, 2013; 20th July, 2013; 17th August, 2013;  14th September, 2013; 20th September, 2013;  22nd September, 2013; 28th September, 2013; 5th October, 2013; 12th October, 2013; 19th October, 2013; 27th October, 2013;  SPEED POST Letter dated 7th November, 2013; 17th November, 2013; 1st December, 2013; 19th January, 2014; 6th March, 2014; 12th March, 2014; 23rd March, 2014; 29th March, 2014; 30th March, 2014; 13th April, 2014; 26th April, 2014; 10th May, 2014; 18th May, 2014; Speed Post Letter dated 19th May, 2014; 21st May, 2014; 24th May, 2014; 26th May, 2014; 12th June, 2014; 21st June, 2014; 23rd June, 2014; 28th June, 2014; 30th June, 2014; 1st July, 2014; 5th July, 2014; 7th July, 2014; 8th July, 2014; 18th July, 2014 and 19th July, 2014 regarding 'Sanctioning of Domestic Piped Natural Gas (PNG) connections to the residents of Mahagunpuram Phase I, NH-24, Mehrauli, Ghaziabad, Uttar Pradesh'.

 

2.         Kindly refer to your replies dated 3rd February, 2014 and 13th March, 2014 regarding supplying of Domestic Piped Natural Gas (PNG) connections to the residents of Mahagunpuram Phase I, NH-24, Ghaziabad, Uttar Pradesh.

 

3.         Kindly also refer to the following two replies dated  7th July, 2014 and 8th July, 2014 received from Col Surajit Roy, Vice President (Facility Management), Mahagun Group {Mahagun India Private Limited (Mahagun Real Estate Private Limited) : Builder}, Zonal Office, B–44 (No. 44, Tower–B), 4th Floor, The Corenthum, Plot No. A-41/42, Sector–62, Noida – 201307, Uttar Pradesh [sroy@mahagunindia.com], as under :-

 

(a)       Reply dated 7th July, 2014 : "Our full support for any modification if needed from Project to implement the PNG at PH-I of Mahagun Puram.  You organise the date and time for the tripartite signing off of the Agreement between all of us and let me know".

 

(b)       Reply dated 8th July, 2014 : "Acknowledged".

 

4.         In addition to above, kindly also refer to your reply dated 21st July, 2014 as under :-

 

"This refers to the trailing mails, we request you to kindly depute architects and MEP officials of Mahagunpuram project to come for a meeting with IGL officials at IGL office, National Fertilizers Limited, Sector – 24, Noida.  Kindly convey the day and time as per your convenience".

 

5.         Many thanks for your positive responses in this regard for which we all are grateful to you; Shri Nahar Singh and all other Officers of IGL at New Delhi and Noida, who are associated with this Project of Mahagunpuram Phase – I, NH-24, Mehrauli, Ghaziabad, Uttar Pradesh. 

 

6.         Shri Surjeet Singh, General Secretary and other Executive Members of Mahagunpuram Apartment Owners Association (MP-AOA) and Officers/Architects of Mahagun Group [Mahagun India Private Limited (Mahagun Real Estate Private Limited) : Builder] will meet the Officers of Indraprastha Gas Limited (IGL) at IGL's Office, National Fertilizers Limited, Sector – 24, Noida on Thursday, the 24th July, 2014 at 1500 Hours (3.00 P.M.).  This has also been confirmed by Surjeet Singh (Mobile Number : 9818771316; E-mail ID : surjeet_cavs@yahoo.co.uk), General Secretary, MP–AOA to Shri Nahar Singh, IGL, New Delhi and as well as to Col Surajit Roy, Vice President (Facility Management), Mahagun Group [MIPL (MREPL)], Noida, Uttar Pradesh, respectively, today itself, for further necessary action.

 

7.         Kindly acknowledge.

 

Regards.

 

Anand Kumar Sharma

Date : 21st July, 2014.

Tele : 9582346656 and 9868314171.

Addresses :-

(1)  A – 236, First Floor, Pandara Road, New Delhi – 110003.

(2)  Flat No. 1106, Riddhi Block, Mahagunpuram, NH-24, Mehrauli,

      Ghaziabad – 201002, Uttar Pradesh.

 

Copy for information and further necessary action to :-

 

1.         General VK Singh, PVSM, AVSM, YSM (Retd), Hon'ble Minister of State for External Affairs and Hon'ble Member of Parliament (Lok Sabha), 2/27, Raj Nagar, Ghaziabad, Uttar Pradesh [E-mail ID : eloksabhagzb@gmail.com].

 

2.         Shri Nahar Singh, Indraprastha Gas Limited (IGL), IGL Bhawan  Plot No. 4,  Community Centre, Sector 9,  R.K. Puram, New Delhi – 110022 (E-mail ID : nahar.singh@igl.co.in).

 

3.         Shri Vinod Kumar Dhaaka, Indraprastha Gas Limited, New Delhi (vinod.dhaaka@igl.co.in). 

 

4.         Customer Care, Indraprastha Gas Limited, New Delhi (customercare.png@igl.co.in; anshul@igl.co.in; nikhil.nangia@igl.co.in; manish25170@yahoo.co.in). 

 

5.         Col Surajit Roy, Vice President (Facility Management), Mahagun Group {Mahagun India Private Limited (Mahagun Real Estate Private Limited)}, Zonal Office, B–44 (No. 44, Tower–B), 4th Floor, The Corenthum, Plot No. A-41/42, Sector–62, Noida – 201307, Uttar Pradesh [sroy@mahagunindia.com].  Final meeting has been scheduled on Thursday, the 24th July, 2014 at 1500 Hours (3.00 P.M.) at IGL's Office, National Fertilizers Limited, Sector – 24, Noida for signing of Tripartite Technical Agreement.  You are requested to kindly attend it and also depute Architechts and Officers of Mahagun Group [MIPL (MREPL)] for this final meeting.   

 

6.         Director, Mahagun Real Estate Private Limited (MREPL), NOIDA, Uttar Pradesh; Shri Anil Jain, Deputy General Manager, Mahagun Real Estate Private Limited (MREPL), Maintenance Office, Vinayak Block, Basement, Mahagunpuram, NH-24, Mehrauli, Ghaziabad – 201002, Uttar Pradesh [E-Mail ID : aniljain.mahagun@gmail.com] and all other Concerned Officers of Mahagun Real Estate Private Limited (MREPL), Zonal office, No. 44, Tower–B, 4th Floor, Corenthum, Sector–62, Noida – 201307, Uttar Pradesh / CSK (Maintenance Agency, Mahagunpuram, NH-24, Mehrauli, Ghaziabad, Uttar Pradesh [mahagun@gmail.com; sroy@mahagunindia.com; svarshney@mahagunindia.com; scsharma@mahagunindia.com; mayank.fbd@gmail.com; aniljain.mahagun@gmail.com; handingover@mahagunindia.com, customercare@mahagunindia.com, info@mahagunindia.com, info.mahagunindia@gmail.com, marketing@mahagunindia.com; ajeetchaubey.csk@gmail.com; mahagunpuram.csk@gmail.com].  Final meeting has been scheduled on Thursday, the 24th July, 2014 at 1500 Hours (3.00 P.M.) at ILG's Office, National Fertilizers Limited, Sector – 24, Noida for signing of Tripartite Technical Agreement.  You all are also requested to kindly depute Architechts and Officers of Mahagun Group [MIPL (MREPL)] for this final meeting.   

 

7.         Shri Surjeet Singh (Mobile Number : 9818771316; E-mail ID : surjeet_cavs@yahoo.co.uk), General Secretary, Mahagunpuram Apartment Owners Association [MP-AOA], Mahagunpuram, NH-24, Mehrauli, Ghaziabad, Uttar Pradesh – 201002. 

 

8.         Executive Members of Mahagunpuram Apartment Owners Association [MP-AOA], Mahagunpuram, NH-24, Mehrauli, Ghaziabad, Uttar Pradesh – 201002 (sheetal_tyg@yahoo.co.in; smarttapan@yahoo.com; arvind.amity29@gmail.com uttam.singh@kanbaninfosystem.com; dr_d_k_srivastava@yahoo.co.in; vaibhavincontact@gmail.com; avdheshks@gmail.com; saxena111@gmail.com; icjindal@gmail.com; agarwalkamal15@gmail.com, mahagunpuramaoa@gmail.com).

 




__._,_.___

Posted by: anasee2162@yahoo.in


-------------AAAAAAAAAAA-----------------------





__,_._,___

[Mahagunpuram] Cover car parking for rent





Hi All,

cover car parking avialable for rent, If any one intrested Pls call
 
Best Regards
Abhishek Singh
+91-07838300612
"Success is a Travel
Not Destination "


__._,_.___

Posted by: Abhishek Singh <abhima21@yahoo.com>


-------------AAAAAAAAAAA-----------------------





__,_._,___

Sunday, July 20, 2014

[Mahagunpuram] GBM : MAHAGUNPURAM, NH -24, MEHRAULI, GHAZIABAD : 20 JULY 2014



Congratulations to MP-AOA Team by superbly organising the GBM yesterday.  Also,  thanks to all for the regards given to me at GBM yesterday (20 July 2014).


Sent from Samsung Mobile


__._,_.___

Posted by: ANAND KUMAR SHARMA <anasee2162@yahoo.in>


-------------AAAAAAAAAAA-----------------------





__,_._,___

[Mahagunpuram] WIDENING OF NH -24 FROM UP GATE (DELHI-UP BORDER) TO DASNA.



WIDENING OF NH–24 FROM UP GATE (DELHI-UP BORDER) TO DASNA.

SCHEDULE OF BIDDING PROCESS  :  RFP (REQUEST FOR QUALIFICATION) FOR "DEVELOPMENT OF DELHI-MEERUT EXPRESSWAY AND OTHER CONNECTING ROADS INCLUDING 6/8-LANING OF NH-24 FROM KM 0 TO KM 49.923 (HAPUR BYPASS), 6-LANING OF NH-58 FROM KM 6.800 (DELHI - UP BORDER) TO KM 52.528 (MEERUT BYPASS) AND NH-235 FROM KM 0.360 TO 8.80 IN THE STATE OF DELHI & UTTAR PRADESH ON DBFOT (TOLL) BASIS UNDER NHDP PHASE-VI".

The Authority (National Highways Authority of India) shall endeavour to adhere to the following schedule :-

Last date for receiving queries  :  01.04.2014;  Pre-Bid meeting  :  02.04.2014 (11.00 hrs at NHAI HQ, New Delhi);  Authority response to queries latest by 10.04.2014;  Last Date of Sale of Tender Document : 05.06.2014 (upto 15.00hrs);  Bid Due Date  :  06.06.2014 (upto 11.00hrs);  Opening of Bids  :  06.06.2014 (upto 11.30hrs);  Letter of Award (LOA)  :  Within 30 days of Bid Due Date;  Validity of Bids  :  120 days of Bid Due Date and Signing of Concession Agreement  :  Within 30 days of award of LOA (Letter of Award).


Sent from Samsung Mobile


__._,_.___

Posted by: ANAND KUMAR SHARMA <anasee2162@yahoo.in>


-------------AAAAAAAAAAA-----------------------





__,_._,___

Saturday, July 19, 2014

[Mahagunpuram] REQUEST TO SANCTION METRO LINE EXTENSION UP TO MEHRAULI, NH-24, GHAZIABAD FROM VAISHALI, GHAZIABAD/DABUR CHOWK, GHAZIABAD ALONG NH-24, GHAZIABAD (Ghaziabad Development Authority’s Official Website Link : http://demo.gdaghaziabad.com/schemes/Metro_GZB.pdf) AND ALSO SANCTION OF METRO STATIONS AT VARIOUS IMPORTANT PLACES ALONG NH-24, GHAZIABAD. [3 Attachments]

[Attachment(s) from anasee2162@yahoo.in [MahagunpuramRWA] included below]

REQUEST TO SANCTION METRO LINE EXTENSION UP TO MEHRAULI, NH-24, GHAZIABAD FROM VAISHALI, GHAZIABAD/DABUR CHOWK, GHAZIABAD ALONG NH-24, GHAZIABAD (Ghaziabad Development Authority's Official Website Link : http://demo.gdaghaziabad.com/schemes/Metro_GZB.pdf) AND ALSO SANCTION OF METRO STATIONS AT VARIOUS IMPORTANT PLACES ALONG NH-24, GHAZIABAD.

 

RWA Federation, Ghaziabad (Uttar Pradesh); MP-AOA (Mahagunpuram Apartment Owners Association, Mahagunpuram, NH-24, Mehrauli, Ghaziabad, Uttar Pradesh); RWAs/AOAs of Housing Projects along NH-24, Ghaziabad (Uttar Pradesh) and all other residents residing along NH-24, Ghaziabad (Uttar Pradesh) are also requested to send their requests on the above subject in the following way as it will help in speedy approval of the same :-

 

---------- Forwarded message ----------

From :  Anand Sharma <anasee2162@gmail.com>

Date :  Sat, Jul 19, 2014 at 3:28 PM

Subject :  REQUEST TO SANCTION METRO LINE EXTENSION UP TO MEHRAULI, NH-24, GHAZIABAD FROM VAISHALI, GHAZIABAD/DABUR CHOWK, GHAZIABAD ALONG NH-24, GHAZIABAD (Ghaziabad Development Authority's Official Website Link : http://demo.gdaghaziabad.com/schemes/Metro_GZB.pdf) AND ALSO SANCTION OF METRO STATIONS AT VARIOUS IMPORTANT PLACES ALONG NH-24, GHAZIABAD.

 

To :  santosh Helpline <helplinegda@gmail.com>, awas@up.nic.in, awasbandhu@gmail.com

Cc :  "Gen V. K. Singh" <eloksabhagzb@gmail.com>, secyurban@nic.in, ncrpb-ms@nic.in, ncrpb-crp@nic.in, ncrpb-dr@nic.in, ncrpb-jd1@nic.in, ncrpb-aa02@nic.in, ncrcellup@gmail.com, md@dmrc.org, mddmrc@gmail.com, helpline@dmrc.org, operations@delhimetrorail.com, planning_dmrc@rediffmail.com, surjeet singh <surjeet_cavs@yahoo.co.uk>, Info MPAOA <info@mpaoa.in>, mahagunpuram aoa <mahagunpuramaoa@gmail.com>, SHEETAL TYAGI <sheetal_tyg@yahoo.co.in>, TAPAN KUMAR <smarttapan@yahoo.com>, Arvind Tiwari <arvind.amity29@gmail.com>, uttam.singh@kanbaninfosystem.com, "dr_d_k_srivastava@yahoo.co.in" <dr_d_k_srivastava@yahoo.co.in>, Vaibhav Bhatnagar <vaibhavincontact@gmail.com>, Avdhesh Kumar <avdheshks@gmail.com>, Shailendra Saxena <saxena111@gmail.com>, ISHWAR CHAND JINDAL <icjindal@gmail.com>, kamal agarwal <agarwalkamal15@gmail.com>

To

 

The Vice Chairman,             

Ghaziabad Development Authority,

Vikas Path, Near Old Bus Stand,          

Ghaziabad – 201001,

Uttar Pradesh.

( Email ID :  secyurban@nic.in )

 

The Principal Secretary

(Housing and Urban Planning Department),

Government of Uttar Pradesh,

Bapu Bhawan,

Vidhan Sabha Marg,

Lucknow – 226001,

Uttar Pradesh.

[ E-mail IDs :  awas@up.nic.in and awasbandhu@gmail.com ]

 

SUBJECT : REQUEST TO SANCTION METRO LINE EXTENSION UP TO MEHRAULI, NH-24, GHAZIABAD FROM VAISHALI, GHAZIABAD/DABUR CHOWK, GHAZIABAD ALONG NH-24, GHAZIABAD (Ghaziabad Development Authority's Official Website Link : http://demo.gdaghaziabad.com/schemes/Metro_GZB.pdf) AND ALSO SANCTION OF METRO STATIONS AT VARIOUS IMPORTANT PLACES ALONG NH-24, GHAZIABAD.

 

Respected Sir,

 

1.      Kindly refer to my requests dated 6th April, 2014; 12th May, 2014; 2nd June, 2014; 8th June, 2014; 14th June, 2014; 28th June, 2014; 4th July, 2014 and 14th July, 2014 on the above subject.  I am, once again, requesting for the same.

 

2.      Also, kindly refer to the following interim replies received from Delhi Metro Rail Corporation Limited, New Delhi (operations@delhimetrorail.com & planning_dmrc@rediffmail.com); National Capital Region Planning Board, New Delhi; Ghaziabad Development Authority, Ghaziabad, Uttar Pradesh (helplinegda@gmail.com) and NCR Cell (UP), Town & Country Planning Department, Ghaziabad, Uttar Pradesh (ncrcellup@gmail.com) , as under :-

 

(a)     Interim Reply dated 29th May 2014 (copy attached please) received by me on 5th June, 2014 from Shri Ashok Kumar Gupta, Chief Engineer (Planning), Delhi Metro Rail Corporation Limited (planning_dmrc@rediffmail.com)  :  "Your email dated 6th April, 2014.  Your request for the sanction of Metro Line Extension up to Mehrauli, NH-24, Ghaziabad from Vaishali, Ghaziabad/Dabur Chowk along NH-24, Ghaziabad has been examined.  In this regard, it is to submit that the above mentioned request pertains to Ghaziabad Development Authority / Govt. of Uttar Pradesh.  You may take up the matter with GDA / Government of Uttar Pradesh.  Thanking you".

 

(b)     Interim Reply dated 20th June 2014 received by me on 27th June, 2014 from Nodal Officer and JE, Ghaziabad Development Authority, Ghaziabad (helplinegda@gmail.com)  :  "Ghaziabad Development Authority has not prepared D.P.R for the alignment mentioned in this letter.  We will let you know as and when proposals are prepared".  

 

(c)     Interim reply dated 25th June, 2014 (copy attached please) received by me on 26th June, 2014 from Shri J.N. Barman, Director (Technical), National Capital Region Planning Board [Ministry of Urban Development], 1st Floor, Core – IV B, India Habitat Centre, Lodhi Road, New Delhi – 110003 addressed to Mrs. Kalpana Awasthi, Commissioner, NCR Cell (UP), Town & Country Planning Department, Navyug Market, Commercial Building, II Floor, Ghaziabad (UP) – 201001 forwarding therewith my request 8th June, 2014 on the above subject for necessary action  :  "Board has received a copy of the representation from Shri Anand Kumar Sharma through email dated 08.06.2014 (copy enclosed), addressed to the Secretary (Ministry of Urban Development) and Chairman, DMRC regarding request to sanction metro line extension to Mehrauli, NH-24, Ghaziabad from Vaishali, Ghaziabad/Dabur Chowk and also sanction of metro stations at various stations at various important places along NH-24, Ghaziabad.  Since the matter is related to Ghaziabad Development Authority (GDA) / Government of Uttar Pradesh, it is requested that the representation may please be got examined by Govt. of U.P. / G.D.A. for necessary action and a suitable reply may be sent to the representationist under intimation to this Board".

 

(d)     Interim reply dated 28th June, 2014 received from Customer Services (Operations), Delhi Metro Rail Corporation Limited (helpline@dmrc.org)  :  "Thanks for sparing your valuable time and writing to us.  Your feedback is valuable and important to us, we will revert back to you at the earliest.  Assuring you best services".

 

(e)     Interim Reply dated 3rd July, 2014 (copy attached) received from Ms. Kalpana Awasthi, Commissioner, NCR Cell (UP), Town & Country Planning Department, Navyug Market, Second Floor, Nagar Nigam Bhawan (Commercial Building), Ghaziabad, Uttar Pradesh – 201001 [E-mail ID : ncrcellup@gmail.com].  She forwarded my request to the Vice Chairman, Ghaziabad Development Authority (GDA), Ghaziabad for detailed examination and further necessary action by GDA and, thereafter, replying the same to the National Capital Region Planning Board (Ministry of Urban Development), New Delhi accordingly [with copies of it to Shri J.N. Barman, Director (Technical), NCRPB, New Delhi and to the undersigned].

 

3.      I am grateful to Delhi Metro Rail Corporation Limited; National Capital Region Planning Board; Ghaziabad Development Authority and NCR Cell (UP), Town & Country Planning Department for the above interim replies.  In the above interim replies, no definite timeframe has been given for sanction of Metro Line Extension up to Mehrauli, NH-24, Ghaziabad from Vaishali, Ghaziabad/Dabur Chowk along NH-24, Ghaziabad alongwith Metro Stations at twelve important places along NH-24, Ghaziabad.  You are requested to kindly instruct the concerned to give definite timeframe for that, for which we all will be highly grateful to you. 

 

4.      In this connection, I may state here that Metro Line Extension up to Mehrauli, NH-24, Ghaziabad from Vaishali, Ghaziabad/Dabur Chowk, Ghaziabad along NH-24 Ghaziabad is a part of Metro Line Extension up to Dasna, NH-24, Ghaziabad from Vaishali, Ghaziabad/Dabur Chowk, Ghaziabad along NH-24 Ghaziabad which is also mentioned in the Ghaziabad Development Authority's Official Website Link (http://demo.gdaghaziabad.com/schemes/Metro_GZB.pdf) [copy of GDA's Official Website Link on the above subject is attached please] and is pending for the last many years. 

 

5.      In the past many years, scores of major Housing Projects have been completed along NH-24 Corridor, Ghaziabad starting from UP Gate, NH-24, Ghaziabad, Uttar Pradesh to Mehrauli, NH-24, Ghaziabad, Uttar Pradesh.  Millions of residents have also started residing in these housing projects.  Some of the Areas are "Indirapuram, NH-24, Ghaziabad; Sector 62 and 63, NOIDA along NH-24; Siddhartha Vihar Yojana, NH-24, Ghaziabad; Crossing Republic, NH-24, Ghaziabad; ABES Engineering College, NH-24, Ghaziabad; Columbia Asia Hospital, NH-24, Ghaziabad; Ashiana's 'Golf Link', NH-24, Ghaziabad; Mahagun's 'Mahagunpuram, NH-24', Ghaziabad; Ansal's 'Tanushree, NH-24', Ghaziabad; ongoing Wave City, NH-24 (4500 acres project), Ghaziabad etc.


6.      To overcome the transport needs of millions of residents residing along NH-24 Corridor (Ghaziabad), you are requested to kindly sanction the extension of Metro Line up to Mehrauli, NH-24, Ghaziabad from Vaishali, Ghaziabad/Dabur Chowk, Ghaziabad along NH-24, Ghaziabad which will benefit millions of residents residing along NH-24 for which we all will be highly obliged to you. 

 

7.      In view of the above, it is also requested that Metro Stations along NH-24, Ghaziabad, Uttar Pradesh may also kindly be sanctioned at the following twelve important places :-

 

(a)     UP Gate Police Station, NH-24, Ghaziabad.

(b)     Gaur Green City, Indirapuram, NH-24, Ghaziabad;

(c)     Sarojini Naidu Marg, NH-24, Ghaziabad;

(d)     CISF Crossing, Indirapuram, NH-24, Ghaziabad;

(e)     Sector 62, NOIDA Crossing, NH-24, Ghaziabad;

(f)      Sector 63, NOIDA Crossing, NH-24, Ghaziabad;

(g)     Siddhartha Vihar, NH-24, Ghaziabad;

(h)     Vijay Nagar Bypass, NH-24, Ghaziabad;

(j)      ABES Engineering College/Crossing Republic, NH-24;

(k)     Lal Kuan, NH-24, Ghaziabad;

(l)      Columbia Asia Hospital, NH-24, Ghaziabad; and

(m)    Mahagunpuram, NH-24, Mehrauli, Ghaziabad.

 

8.      In view of the above, you are, once again, requested to kindly instruct the concerned to prepare D.P.R for the alignment mentioned in my above request at the earliest and also sanction the extension of Metro Line up to Mehrauli, NH-24, Ghaziabad from Vaishali, Ghaziabad/Dabur Chowk, Ghaziabad along NH-24, Ghaziabad alongwith Metro Stations at the twelve important places as mentioned at Para 7 (a) to (m) above.  By sanctioning this Metro Rail Route along with Metro Stations along NH-24, Ghaziabad (Ghaziabad Development Authority's Official Website Link : http://demo.gdaghaziabad.com/schemes/Metro_GZB.pdf) [copy of GDA's Official Website Link on the above subject is attached please], you will help millions of residents residing along NH-24 Corridor, Ghaziabad, for which we all will be highly obliged to you. 

 

9.      Kindly acknowledge.

 

Regards,

Anand Kumar Sharma

Date : 19th July, 2014.

Tele : 9582346656 and 9868314171.

Addresses :

(1)  A – 236, First Floor, Pandara Raod, New Delhi – 110003.

(2)  Flat No. 1106, 11th Floor, Riddhi Block, Mahagunpuram, NH-24, Mehrauli, Ghaziabad – 201002, Uttar Pradesh.

 

Attachments : As stated above.

 

Copy for information and further necessary action to :-

 

1.      General VK Singh, PVSM, AVSM, YSM (Retd), Hon'ble Minister of State for External Affairs and Hon'ble Member of Parliament (Lok Sabha), 2/27, Raj Nagar, Ghaziabad, Uttar Pradesh [E-mail ID : eloksabhagzb@gmail.com].

 

2.      Chairman, DMRC Limited and Secretary, Ministry of Urban Development, Room No 122-C, First Floor,  Nirman Bhawan, New Delhi – 110011 (Email ID : secyurban@nic.in).

 

3.      Member Secretary, National Capital Region Planning Board
(Ministry of Urban Development), Core–IV B, First Floor, India Habitat Centre, Lodhi Road, New Delhi – 110003 [E-mail IDs :
ncrpb-ms@nic.in; ncrpb-crp@nic.in; ncrpb-dr@nic.in; ncrpb-jd1@nic.in; ncrpb-aa02@nic.in]Many thanks for forwarding my request on 25th June, 2014 to the concerned authorities for examination and necessary action.

 

4.      Ms. Kalpana Awasthi, Commissioner, NCR Cell (UP), Town & Country Planning Department, Navyug Market, Second Floor, Nagar Nigam Bhawan (Commercial Building), Ghaziabad, Uttar Pradesh – 201001 [E-mail ID : ncrcellup@gmail.com].  Many thanks for forwarding my request on 3rd July, 2014 to the Vice Chairman, Ghaziabad Development Authority (GDA), Ghaziabad for detailed examination and further necessary action by GDA and, thereafter, replying the same to the National Capital Region Planning Board (Ministry of Urban Development), New Delhi accordingly [with copies of it to Shri J.N. Barman, Director (Technical), NCRPB, New Delhi and to the undersigned].

 

5.      Managing Director, Delhi Metro Rail Corporation Limited, Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi – 110001 [E-mail IDs : md@dmrc.org; mddmrc@gmail.com; helpline@dmrc.org; operations@delhimetrorail.com; planning_dmrc@rediffmail.com].

 

6.      Shri Surjeet Singh (E-mail IDs : surjeet_cavs@yahoo.co.uk; info@mpaoa.in), General Secretary, Mahagunpuram Apartment Owners Association [MP-AOA], Mahagunpuram, NH 24, Mehrauli, Ghaziabad, Uttar Pradesh – 201002.

 

7.      Executive Members of Mahagunpuram Apartment Owners Association [MP-AOA], Mahagunpuram, NH-24, Mehrauli, Ghaziabad, Uttar Pradesh – 201002 [E-mail IDs : mahagunpuramaoa@gmail.com; sheetal_tyg@yahoo.co.in; smarttapan@yahoo.com; arvind.amity29@gmail.comuttam.singh@kanbaninfosystem.com; dr_d_k_srivastava@yahoo.co.in; vaibhavincontact@gmail.com; avdheshks@gmail.com; saxena111@gmail.com; icjindal@gmail.com; agarwalkamal15@gmail.com].

 




__._,_.___

Attachment(s) from anasee2162@yahoo.in [MahagunpuramRWA] | View attachments on the web

3 of 3 Photo(s)


__,_._,___