We are discussing about our Mahagunpuram family on this blog via comment section. Since the discussion in the form of comments is not easy to track, so here I have compiled them into one post month-wise. You can easily go through them to track various discussion here.
All the very recent discussion is directly available on the main page itself.
Just click on the [+] button to expand a particular month. Also, the order of comment posting is maintained so that you can easily track it.
You can also download all the discussion archive in PDF format. Click [Doc/PDF] to download the same.
--------------------
[+] August-2010
Hi Prashant, The force majeure case is valid till Dec 2011. So, the builder can delay by 3 months more without any penalty. After which the penalty clause comes into affect. Mahagun builders has paid for delay of 6 months their Crossing project Mahagun Mascot, which testifies their integrity at this moment. Regarding Sewage pipeline, I think; they can not give possession with incomplete bathrooms. Also, there cannot be a short term arrangement for this. I guess, the amenities like sewage, electricity etc is completed with GDA collaboration, where they run main sewage line to be connected with all projects. Can someone confirm this?
By Gyani on Quick Updates on development status: Demand Letter... on 8/30/10
hi admin i was talking about sewar line, today i have seen some pipe line infront of managunpuram. now i would like to add regarding penalty clause which is attached with the force majeure clause, which creates doubt in mind. today building material cost is very low, so we can ask mahagun people to give some additonal wooden work and RO system just like gaursons in govindpuram have given to their customers without any promise.
By prashant sinha on Mahagunpuram vs Crossing Republic: Pro and Cons on 8/30/10
Ya Vipul, Me too believe the same.
By Gyani on Quick Updates on development status: Demand Letter... on 8/30/10
I already have a flat in Mahagun Mansion at Indirapuram and they have delivered as promised and in committed time.... I have rarely seen any mahagun project getting delayed....so I think Mahagun would not like to downgrade their reputation of delivering in time. what say?
By Vipul on Mahagunpuram vs Crossing Republic: Pro and Cons on 8/29/10
Hello Mr. Singh, We welcome you in the community. If you would like to update our contact excel sheet with your details, please send me your gmail ddress to provide access.
By Gyani on Mahagunpuram vs Crossing Republic: Pro and Cons on 8/29/10
Dear friends , I am also one of the buyer's in Mahagunpuram and i wants to thanks to the admin of this blog for giving so much information and keeping track of builder and projects.Also providing a platefom to buyer's to share their informations. Thanks and regards Devraj singh
By D.R.Singh on New service tax for building under construction : ... on 8/29/10
Hi Prashant, Thanks for the update. Just wanted to know more about Manual Chambers? What is that. Regarding project completion, Mahagunpuram has officially 1.5 Years of time left. Seeing their current pace of work, I expect that the tower structure should be ready by Feb-Mar 2011. After that no idea, how much it might take for finishing Stuff!! But one thing is sure that the penalty clause for delay will be resistant in any slow down of the project. Imagine 500 families will be paid avg 5000 per month.i.e 25 L per month (at least)?
By Admin on Mahagunpuram vs Crossing Republic: Pro and Cons on 8/29/10
hi kapil, mahagunpuram is using ultratech cement from dadri plant, which is fly ash based cement, but as all the major plants have better quality of cement ultratech is also among the best. recently cement prices have come down very sharply from rs 226 to rs 160 or even lower so it is better for mahagun to use better quality cement like opc 43 grade, which is comparatively better than ultratech (ppc) cement. this is as per my knowledge which may be diffrent with technical team at mahagunpuram
By prashant sinha on Mahagunpuram vs Crossing Republic: Pro and Cons on 8/29/10
hi gyani, sample flat size wise its looking very small with maximum loadng. as per the labours it will take around 3-4 year to fully complete. their is no manual chambers in mahagunpuram and even in crossing republic township. i had an enquiry with mahagun when it will be provided and what will the alternater arrangements they said it will be attached with avantika but i don't think it will be possible in 15 months.
By prashant sinha on Mahagunpuram vs Crossing Republic: Pro and Cons on 8/29/10
- Mahagunpuram is around 4 KM from crossings if I remember my car's reading correctly. Anyone has any idea about the construction quality of Mahagunpuram ?
By Kapil Tyagi on Mahagunpuram vs Crossing Republic: Pro and Cons on 8/29/10
Thanks sunny for the update. Hi Anonymous, I have put a comparison on both the crossing republic and Mahagunpuram project, which will answer all your questions. I have had a very good agen, Mr Rajeev Kumar, to guide in this regard, when I was looking for the property. You can take his help, if you wish. His contact number/email is given in on the blog main page, right upper corner.
By Gyani on Mahagunpuram vs Crossing Republic: Pro and Cons on 8/28/10
Hi Gyani, It's 900 SQft falt on 1st floor of Vinayak Tower.
By suny on Bank's loan for Mahagunpuram Project : Update on 8/26/10
Hi friends, Can anyone suggest that how long it going tio take the project... i m mean place to be ready to move in... garden well developed... boundery walls.. main gate to be there... roads in the society... i guess property is on the main high way so thats a big relief in terms of waiting to develop main roads and all. my concern if in crossing structure is ready at the moment than also it seams it will take another 1 year to be full operational what are ur views on mahagum...?? another thing is there any railways line near mahagun or other dealers are just doing a negative publicity abt mahgun...?? dumping yard near crossing is it going to effect mahagun??? heard crossing prices has come dowm due to dumping yard controversy? pls comment
By Anonymous on Indian style lavatory (latrine) in the flats : You... on 8/26/10
Hi Fariz, Will add by today evening.
By Gyani on Bank's loan for Mahagunpuram Project : Update on 8/25/10
Hi Suny, This is a good news. We are eager to see the sample flat. Btw, what is the size of the flat they are furnishing?
By Gyani on Bank's loan for Mahagunpuram Project : Update on 8/25/10
Hi All, On Monday I was visited mahagunpuram, and found they have completed one flat with tiles, doors, kitchen slabs, bathroom fiting etc. they might be planing to use this flat as a sample flat. This is in Vinayak tower on 1st floor.
By suny on Bank's loan for Mahagunpuram Project : Update on 8/24/10
hi gyani please add my google id fariz.ahmed2010@gmail.com
By fariz on Bank's loan for Mahagunpuram Project : Update on 8/23/10
Hi Fariz, I got a bounce mail dfrom your india.com id. Please use your yahoo id to login for Excel sheet access, or send me any gmail id you have (that would be much easier).
By Gyani on Bank's loan for Mahagunpuram Project : Update on 8/23/10
Hi Fariz, Have re-sent invitation to contact access on your yahoo.co.in and and india.com ids. Use the link in the email to access the excel sheet. Please send me the gmail id too, will add the same. Meanwhile try accessing the member area directly via below link: http://mahagunpuram.blogspot.com/p/members-area.html Please let me know, if you still face the problem.
By Gyani on Bank's loan for Mahagunpuram Project : Update on 8/22/10
Sure, I'll take care of mentioning my name from next time rather from this time Sunil
By Sunil on Indian style lavatory (latrine) in the flats : You... on 8/22/10
hello Gyani. not been able to access the members area and also been unable to sign in. even tried to join as a new member using a google id,but unsuccessful. why? cannot understand.
By fariz on Bank's loan for Mahagunpuram Project : Update on 8/22/10
Thanks for understanding Gyani....
By Vipul on Bank's loan for Mahagunpuram Project : Update on 8/22/10
Hi Anonymous, I have had similar request.I had a word with my agent and he informed that many people are willing to make both as India, which I am not agree to. So, opinion here is divided :). Let us see, how things work. One small request from you. While posting a comment, you can enter your name; if you don't mind; so that we can identify you.
By Gyani on Indian style lavatory (latrine) in the flats : You... on 8/21/10
Hi Kapil/Vipul, Have reverted back to the old theme. Many of our members did not find the new one good enough :) . Will come up something better to showcase later.
By Gyani on Bank's loan for Mahagunpuram Project : Update on 8/21/10
I agree with Kapil...
By Vipul on Bank's loan for Mahagunpuram Project : Update on 8/21/10
A small request. Can we change the layout of the blog to white background ? Somehow, I find it very unreadable.
By Kapil Tyagi on Bank's loan for Mahagunpuram Project : Update on 8/20/10
Hi, If you come from Anand Vihar to Crossing then drive straight around4 Km more to reach Mahagunpuram. One KM before mahagunpuram you will be able to see Hospital Columbia Asia on your left.
By Sunil on Ghaziabad Metro : Miscellaneous news on 8/20/10
I totaly agree with Gyany to have one of the lavatory as English and other as Indian. Last weekend (15/08) I visited Mahagunpuram site and had a discussion with one of the Mahagun officials regarding this, though he mentioned that many flat owners of Mahagunpuram have requested for same (One Indian + One English style lavatory)but currently they are not intertaining these requests, he asked me to contact Mahagun in March-April next year for it.
By Anonymous on Indian style lavatory (latrine) in the flats : You... on 8/20/10
Hi, Pls guide me how to reach mahagunpuram... I have been uptill crossing republic which is more or less on the staright road ehile coming from anad vihar ISBT...i guess 10km from ISBT How far is mahgunpuram from crossing republic?
By Anonymous on Ghaziabad Metro : Miscellaneous news on 8/20/10
Hi Manish, Welcome to our community blog. I will provide you the access to our contact details soon. Please join us in the Mahagunpuram family section, if not already done. Thank
By Gyani on Bank's loan for Mahagunpuram Project : Update on 8/19/10
Hi Sidharth, Welcome to the Mahagunpuram family and thanks for your interest in the blog. Please click on the join button the Mahagupuram Family section on the website. You need to login through your gmail ID to join. I will soon provide you the access to our contact detail Excel sheet, so that you can update our centralized contact database.
By Admin on Bank's loan for Mahagunpuram Project : Update on 8/19/10
Hi, my id is manishkugupta@gmail.com
By Manish on New Page : Members Area. on 8/19/10
Please include me as a member to this blog. I own a flat in Vinayak block (932). my ID is : Siddhartha.yadav@gmail.com
By siddhartha on New Page : Members Area. on 8/19/10
Hi GreatAbhi, I have given u the access rights to contact list. Request to the members to update their details as soon as possible, if not done yet.
By Gyani on Ghaziabad Metro : Miscellaneous news on 8/18/10
Friends, I have added a common discussion board with much rich features to our blog. Please check the top right link "Discussion Board", and use this feature for centralized discussions.
By Gyani on Ghaziabad Metro : Miscellaneous news on 8/18/10
Hi Anand, At this moment the Ghaziabad Metro future does not seems great. In the latest post, it is reported that the political tussle is going to impact the process gravely. Even the Vaishali metro, which was supposed to be in running condition is lagging behind. The 2nd phase and 3rd phase promise to include two new routes Dilshad Garden-New Bus Adda and Vaishali-Meharaulli. But till now there is no clue when they will stat and how they will be funded. See the link below for detail routes : http://mahagunpuram.blogspot.com/2010/03/ghaziabad-metro-update-phase-ii.html
By Gyani on Ghaziabad Metro : Miscellaneous news on 8/18/10
Thanks for timely updates. Can anybody has any idea about the route from where to where metro will come to mahagunpuram arae.what is the expected time to be running metro at nh24 mahagun area.will it take sep2011 or dec-2011 or even later.
By Anand Napit on Mahagun Mahagunpuram Development status : Site Pic... on 8/18/10
Hi GreatAbhi, Welcome on-board Mahagun Family. Please join this blog via Members section. We would love to know about you. Please let us know about you. I will provide you our contact access soon. Keep in touch.
By Gyani on Ghaziabad Metro : Miscellaneous news on 8/18/10
Hi Anonymous, I think your budget is good enough for a 900 Sq ft flat in the Mahagunpuram project. I will suggest you to get in touch with following person for all teh latest payments and cost related matters. He is a very good person as real estate agent. Personally, i had a great experience and he helped me in everything; otherwise it would been difficult for me being located in Mumbai. Rajeev Kumar Phone: 09810710206, 09289496107 Email: rajeev1073@rediffmail.com
By Gyani on Ghaziabad Metro : Miscellaneous news on 8/18/10
Thanks gyani & greatabhi for the info u have provided me about the schools in nearby area of mahagun... my budget is around 15-16 L so can i get a flat in mahagunpuram in this budget... what would be the additional cost like registery etc etc...
By Anonymous on Mahagun Mahagunpuram Development status : Site Pic... on 8/17/10
Hello All, There are 2-3 schools near by the project(with-in 3KM). Silverline school,Sanskar School,Gurukul the school and Ryan School. One Bank is also located with in 2 KM (Union Bank of India ,Mehrauli Branch,Gzb) what do you guys think,will this project be completed with-in time ?? Abhishek -09311858440
By greatabhi on Mahagun Mahagunpuram Development status : Site Pic... on 8/17/10
Hi Anonymous, I have seen a public school board just nearby ahead of Mahagunpuram project. One thing, no one can beat that Ghaziabad is a educational hub with many good schools, Engineering College and one of the best management school in India. As far i know, most of the people here plans to be resident of this project.
By Gyani on Mahagun Mahagunpuram Development status : Site Pic... on 8/17/10
any GOOD schools in near by area????????// so ppl here have purchased flats as an investment purpose or they wil move in when it is ready??????
By Anonymous on Mahagun Mahagunpuram Development status : Site Pic... on 8/17/10
Hi Sunny, There is a little correction in the definition. Super Built up Area = Flat + Staircase + all common space on your floor etc. Builtup Area = Flat along with Wall. Carpet Area = All the space inside flat, where you can place a carpet. If you see in the brochure, they have mentioned Super area as 900, Builtup area as 740. Of course, all builders goof up in mentioning the exact carpet area of a bedroom. They just mark it like 10*12 and likewise, which happens to be lesser; if it is mentioned according to the builtup area :(
By Gyani on Indian style lavatory (latrine) in the flats : You... on 8/13/10
Hi Vipul/Gyani I think carpet area is that area what you are going to use, bcause i had a chat with few other builders sales person, according to them the walls are comming under super area not your actual area. If they are saying that 740 is your carpet area that means you can use those space but any how you are not going to use the walls, that's why we are saying it carpet area. For an example. If they are saying that your bedroom size is 12*10 then this should be your free space not including the walls. walls, stairs, lift space etc. always comes under the 900 SQft. not 740. Just correct me if i am wrong.
By suny on Indian style lavatory (latrine) in the flats : You... on 8/13/10
Hi Sunny, Vipul is correct in explaining. A rough calculation is as below, which you can apply in any Indian housing projects. Carpet Area = (Super Area * 65)/100 or Carpet Area = (Builtup Area * 20)/100 So, the carpet area is 35% lesser than Super area, in your case 900 Sq FT. This is sometimes called loading factor also, I guess. The 740 SQ ft in the agreement must have measurement for BuiltUp area.
By Gyani on Indian style lavatory (latrine) in the flats : You... on 8/13/10
Hi Suny, I think I got your point...what you are measuring is carpet area. the difference between carpet Area and Super area is that...Carpet Area = Super Area minus Area covered by walls. Suppose is the walls are 9 inch think then you have to reduce area covered by 9 inch walls from 740 sq feet. I think this shld come to around what you are measuring. Anybody...please validate my understanding.
By Vipul on Indian style lavatory (latrine) in the flats : You... on 8/13/10
Hi Gyani, Super area is 900 Sqft and accoring to Builder, carpet area must be 740 Sqft. but when i measured it on construction site, i found that was just around 600 sqft.
By suny on Indian style lavatory (latrine) in the flats : You... on 8/13/10
I am afraid to say that I am not going to buy ur suggestion. Even for ur relatives + parents, western toilets are gud. If u want to do any modification, duly inform the Mahagun.
By Umesh on Indian style lavatory (latrine) in the flats : You... on 8/12/10
Hi Gyani, For me, I do not want Indian style lavatory. You guys may go ahead with modification in your respective flats, but, as I have already mentioned, I would not be able to support this cause. Am sorry for that, but this is my personal option. I am residing since past three years in my current house and have never faced any issue till now so might be due to that my opinion differs....I hope you guys will understand...:)..
By Vipul on Indian style lavatory (latrine) in the flats : You... on 8/12/10
Hi Sunny, Sent the invitation.
By Gyani on New Page : Members Area. on 8/12/10
Hi Sunny, What is the super area of your flat? e.g. is it 900, 1100, 1300?
By Gyani on Indian style lavatory (latrine) in the flats : You... on 8/12/10
Hi, my id is suny81184@gmail.com
By suny on New Page : Members Area. on 8/12/10
Hi, I have another concern regarding the Actual size of the flat, I have seen and found the actual size (Carpet size)is not equals to what they are offering on allotment letter, on my allotment letter it's written carpet area 740 Sq ft, but when i have calculated there, i found it's around 600 sqft only. did you guys have observed this?
By suny on Indian style lavatory (latrine) in the flats : You... on 8/12/10
Hi Vipul, I truly understand and agree with your fact. But, don't you face problem, when relative visit you; actually my case is this :). I do not have any problem with English lavatory, but relative do ask for :). What my suggestion is to have one of the lavatory as English and other as Indian. This will keep an option open for anybody to use as per their convenience. What do you suggest?
By Gyani on Indian style lavatory (latrine) in the flats : You... on 8/12/10
This is solely my personal opinion...I wont prefer Indian style lavatory..as my parents are old and due to their knee problem..Indian style lavatory will be of no use to me. In my current house also I have one Indian style bathroom and it is unused since I have shifted to this house. I am sorry, but I would not be able to support this fact.
By Vipul on Indian style lavatory (latrine) in the flats : You... on 8/12/10
Friends, I have given access rights to all the request, I have received as of now. Please feel free to write me, if you have any issue.
By Gyani on New Page : Members Area. on 8/11/10
mine is "dhankhar.manojkumar@yahoo.in"
By Manoj Kumar Dhankhar on New Page : Members Area. on 8/11/10
thanks for the effort my id is fariz_af@yahoo.co.in
By fariz on New Page : Members Area. on 8/11/10
Thx for approprate effort for new mahgun family Mr.GUANI Portal would be convient for making new member pls send us link for my mail ID is hslondon07@gmail.com
By hslondon07 on New Page : Members Area. on 8/11/10
Hi Umesh and All, I have created a private online excel sheet to share the contact details. Please see the below link and send me your email IDs for invitation. http://mahagunpuram.blogspot.com/p/members-area.html
By Admin on Mahagun Mahagunpuram Development status : Site Pic... on 8/10/10
thanks for the update .
By fariz on Mahagun Mahagunpuram Development status : Site Pic... on 8/10/10
Hi Umesh, It is great idea to have our contact details shared. But let us keep this in a more secure way, so that it is accessible to our blog members only. I will try to create one such page and let know everybody.
By Gyani on Mahagun Mahagunpuram Development status : Site Pic... on 8/10/10
Hi Vipul, As per my understanding, the basement area in all the blocks are for covered parking. So, basically the parking will be at -1 level of the building. But it will be great, if you can get it confirmed from any reliable source.
By Gyani on Mahagun Mahagunpuram Development status : Site Pic... on 8/10/10
Anyone knows abt any Shopping Mall is going to be open within 1-2 km range as our project prices will only increase when the basic amenities like hospital, malls, shopping complex,schools will open. However, a gud news for all of us. World known hospital chain "COULMBIA ASIA" is going to be inaugrated soon. We shud all speak to Mahagun officials with the basis shops within comples like any bank branch, ATM, medicine shops or any play school for kids within our socity. They planned to open around 25-30 shops. There is also a project opened in LALKUNA by Aditya regarding the same. So keep watching n keep posting.
By Umesh on Mahagun Mahagunpuram Development status : Site Pic... on 8/10/10
Guys, we all are happy with the progress of Mahagunpuram project but we shud also ensure any quality of work. Now a days, many solicities are facing major problems like sewage, plaster is not gud. So we all sud make sure that we will completely keep an eye for the quality. In this Forum, we shud have mobile nos also, so keep sharing the numbers. Mine is 9958007986
By Umesh on Mahagun Mahagunpuram Development status : Site Pic... on 8/10/10
guys....any idea about the parking? i can see in images that they are making flats on ground floor also...that means no stilt parking? so where they are planning to make covered parking? please update if any of you has any clue...
By Vipul on Mahagun Mahagunpuram Development status : Site Pic... on 8/10/10
Hi Anonymous, I do not have idea about NH-48. Where it is?
By Gyani on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 8/9/10
Vipul, Vinayak block is the horse of the race in the project :) - getting built faster, thats why u got demand letter on time (and we are late)
By Gyani on Mahagun Mahagunpuram project status : Site Picture... on 8/9/10
Gosh!!!! Mine is Vinayak and I've paid the money in the month of July itself....
By Vipul on Mahagun Mahagunpuram project status : Site Picture... on 8/9/10
Same here. Haven't received demand letter. Mine is Riddhi block.
By Kapil Tyagi on Mahagun Mahagunpuram project status : Site Picture... on 8/9/10
Thanks Umesh for the update. I am still waiting for the demand letter. Mine is Riddhi block.
By Gyani on Mahagun Mahagunpuram project status : Site Picture... on 8/8/10
Hi Sunil Do you have any about NH-4 8 lane development.
By Anonymous on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 8/7/10
We received Demand letter now.
By Umesh on Mahagun compensating customer for delayed possesst... on 8/5/10
[+] July-2010
Hi LBS, Please send me those photos at my.arena@gmail.com , I will post them on the blog. As far I see in the floor plan and 3D models, there are already place for almiraah (cuboard), of course without wooden cover (Later on we can fit a wooden cupboard in the place.) http://mahagunpuram.blogspot.com/2010/05/manahgun-mahagunpuram-flats-3d-models.html
By Gyani on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 7/28/10
Hi Sunil, Please reuest those people to join this blog. Initially we can make this blog as a networking place between all future mahagunpuram members. We can give posting rights to all members, so that they can post any update along with comments. Everyone, please let me know your opinion.
By Gyani on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 7/28/10
Hi Anonymous, Currently, there are 7 blocks open for booking. But actually there would be 4 more blocks, so total 11 blocks in complete project. You can also check the project layout plan at the following post: http://mahagunpuram.blogspot.com/2010/03/latest-mahaguns-mahagunpuram-projects.html
By gyani on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 7/28/10
Hi friends I have my flat in Vinayak. Today I went to see the construction status. I clicked few photo and video. I want to post those. But I don't know how to do that. I also talked to builder that if I want to make a minor change in my flat (such as a slab on the wall so that I may get the wood work done later to convert it to boxes) but seems they don't agree. Putting slab on the wall can be good idea because it store lots of stuff in. I also conveyed to him that I can pay for that but still they don't agree. Guys what do you say, how we can make the builder agree for that. best of luck for all owners of flats.
By LBS on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 7/25/10
Does any one know that how many towers will be there in Mahagunpuram? I remember initially I was told by Mahagun officials that there will be 7.
By Anonymous on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 7/24/10
This is really good idea Gyani, I knwo many people those are looking for such a group for Mahagunpuran.
By Sunil on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 7/23/10
Guys, I have one more request. I would like to make this forum more stronger as an association. This will be of great help in later stage of Mahagunpuram related issues. Please let other know about this blog and pursue them to join here. I saw a similar group known as CROMA for crossing republic, who took care of many issue in their housing project. They have formed a strong enough group to pressurize builders and govt agencies; in case of any issue in their housing project (such as dumping ground issue.) Please post your suggestion.
By Gyani on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 7/23/10
Thanks Kapil for sharing information regarding construction speed. I have obtained some pictures of the site and will be posting soon. Meanwhile, anybody please update us on Metro related development in Ghaziabad, if you have any person known in metro rail department.
By Gyani on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 7/23/10
I went to Mahagunpuram site last weekend. The construction pace is slow. (maybe due to the monsoon) According to them they have sent demand letter only for Vinayak Tower. Other towers should expect them by the end of July.
By Kapil Tyagi on Mahagun compensating customer for delayed possesst... on 7/19/10
Thats really great news, vipul. That shows that Mahagunpuram project is on-track enough that the Mahagun is showing the confidence in completing it by Sep-2011. Thanks for sharing this.
By Gyani on Mahagun compensating customer for delayed possesst... on 7/16/10
Guys...there is some good news for all of us... one of my friend had been to the site few days back and he told me that Mahagun has placed a huge hoarding at site saying that "Possession in 15 months". Another good news is that...now a days in Delhi Mahagun is advertising Mahagunpuram by saying "assured possession in 15 months". First thing is that they are now actively marketing it....and that too by saying assured possession in 15 months...shows the progress of project.... So cheers to all....:) Vipul
By Vipul on Mahagun compensating customer for delayed possesst... on 7/16/10
yes. it has been confirmed. One of my friend got the PDCs for the same.
By Ankur on Mahagun compensating customer for delayed possesst... on 7/15/10
Thanks Gyani
By Kapil Tyagi on Investment in NCR Projects : An Economy Times anal... on 7/11/10
Hi Kapil, Given post rights. Please check for the invitation email in your mail id. Follow the instruction and let me know, in case u have any issue.
By Gyani on Investment in NCR Projects : An Economy Times anal... on 7/6/10
kapil.tyagi@gmail.com
By Kapil Tyagi on Investment in NCR Projects : An Economy Times anal... on 7/5/10
Hi Manoj, I would be glad to extend the posting rights to our members. Please send me your email ID, so that I can send you an invitation. Thanks.
By Gyani on Investment in NCR Projects : An Economy Times anal... on 7/5/10
Hi Vipul, Thanks for the update. I have not received the demand letter yet. Will track the same.
By Gyani on Investment in NCR Projects : An Economy Times anal... on 7/5/10
Last date is 10th July....I have already mentioned that in my earlier post....
By Vipul on Investment in NCR Projects : An Economy Times anal... on 7/4/10
hi admin, can i post something here? if yes please tell me how
By Manoj Kumar Dhankhar on Investment in NCR Projects : An Economy Times anal... on 7/4/10
hello guys! here is some gud news. check this out "डासना तक 8 लेन का होगा NH 24" http://navbharattimes.indiatimes.com/delhiarticleshow/6125284.cms
By Manoj Kumar Dhankhar on Investment in NCR Projects : An Economy Times anal... on 7/4/10
Hi Vipul, Thanks for the update. Please let us know the last date of the payment. Thanks.
By Gyani on Investment in NCR Projects : An Economy Times anal... on 7/3/10
Got the letter also today...Thanks..
By Vipul on Investment in NCR Projects : An Economy Times anal... on 7/1/10
By Gyani on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 7/28/10
Hi Sunil, Please reuest those people to join this blog. Initially we can make this blog as a networking place between all future mahagunpuram members. We can give posting rights to all members, so that they can post any update along with comments. Everyone, please let me know your opinion.
By Gyani on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 7/28/10
Hi Anonymous, Currently, there are 7 blocks open for booking. But actually there would be 4 more blocks, so total 11 blocks in complete project. You can also check the project layout plan at the following post: http://mahagunpuram.blogspot.com/2010/03/latest-mahaguns-mahagunpuram-projects.html
By gyani on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 7/28/10
Hi friends I have my flat in Vinayak. Today I went to see the construction status. I clicked few photo and video. I want to post those. But I don't know how to do that. I also talked to builder that if I want to make a minor change in my flat (such as a slab on the wall so that I may get the wood work done later to convert it to boxes) but seems they don't agree. Putting slab on the wall can be good idea because it store lots of stuff in. I also conveyed to him that I can pay for that but still they don't agree. Guys what do you say, how we can make the builder agree for that. best of luck for all owners of flats.
By LBS on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 7/25/10
Does any one know that how many towers will be there in Mahagunpuram? I remember initially I was told by Mahagun officials that there will be 7.
By Anonymous on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 7/24/10
This is really good idea Gyani, I knwo many people those are looking for such a group for Mahagunpuran.
By Sunil on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 7/23/10
Guys, I have one more request. I would like to make this forum more stronger as an association. This will be of great help in later stage of Mahagunpuram related issues. Please let other know about this blog and pursue them to join here. I saw a similar group known as CROMA for crossing republic, who took care of many issue in their housing project. They have formed a strong enough group to pressurize builders and govt agencies; in case of any issue in their housing project (such as dumping ground issue.) Please post your suggestion.
By Gyani on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 7/23/10
Thanks Kapil for sharing information regarding construction speed. I have obtained some pictures of the site and will be posting soon. Meanwhile, anybody please update us on Metro related development in Ghaziabad, if you have any person known in metro rail department.
By Gyani on Mahagun Mahagunpuram Project Status : 20 Jul 2010 on 7/23/10
I went to Mahagunpuram site last weekend. The construction pace is slow. (maybe due to the monsoon) According to them they have sent demand letter only for Vinayak Tower. Other towers should expect them by the end of July.
By Kapil Tyagi on Mahagun compensating customer for delayed possesst... on 7/19/10
Thats really great news, vipul. That shows that Mahagunpuram project is on-track enough that the Mahagun is showing the confidence in completing it by Sep-2011. Thanks for sharing this.
By Gyani on Mahagun compensating customer for delayed possesst... on 7/16/10
Guys...there is some good news for all of us... one of my friend had been to the site few days back and he told me that Mahagun has placed a huge hoarding at site saying that "Possession in 15 months". Another good news is that...now a days in Delhi Mahagun is advertising Mahagunpuram by saying "assured possession in 15 months". First thing is that they are now actively marketing it....and that too by saying assured possession in 15 months...shows the progress of project.... So cheers to all....:) Vipul
By Vipul on Mahagun compensating customer for delayed possesst... on 7/16/10
yes. it has been confirmed. One of my friend got the PDCs for the same.
By Ankur on Mahagun compensating customer for delayed possesst... on 7/15/10
Thanks Gyani
By Kapil Tyagi on Investment in NCR Projects : An Economy Times anal... on 7/11/10
Hi Kapil, Given post rights. Please check for the invitation email in your mail id. Follow the instruction and let me know, in case u have any issue.
By Gyani on Investment in NCR Projects : An Economy Times anal... on 7/6/10
kapil.tyagi@gmail.com
By Kapil Tyagi on Investment in NCR Projects : An Economy Times anal... on 7/5/10
Hi Manoj, I would be glad to extend the posting rights to our members. Please send me your email ID, so that I can send you an invitation. Thanks.
By Gyani on Investment in NCR Projects : An Economy Times anal... on 7/5/10
Hi Vipul, Thanks for the update. I have not received the demand letter yet. Will track the same.
By Gyani on Investment in NCR Projects : An Economy Times anal... on 7/5/10
Last date is 10th July....I have already mentioned that in my earlier post....
By Vipul on Investment in NCR Projects : An Economy Times anal... on 7/4/10
hi admin, can i post something here? if yes please tell me how
By Manoj Kumar Dhankhar on Investment in NCR Projects : An Economy Times anal... on 7/4/10
hello guys! here is some gud news. check this out "डासना तक 8 लेन का होगा NH 24" http://navbharattimes.indiatimes.com/delhiarticleshow/6125284.cms
By Manoj Kumar Dhankhar on Investment in NCR Projects : An Economy Times anal... on 7/4/10
Hi Vipul, Thanks for the update. Please let us know the last date of the payment. Thanks.
By Gyani on Investment in NCR Projects : An Economy Times anal... on 7/3/10
Got the letter also today...Thanks..
By Vipul on Investment in NCR Projects : An Economy Times anal... on 7/1/10
[+] June-2010
Thanks Vipul for the update... Than shows that you are the only one waking.... :P Other guys, now wake up... its payment time... :D
By Gyani on Investment in NCR Projects : An Economy Times anal... on 6/29/10
Guys..!!! I got a call from mahagun yesterday regarding next payment...last date is 10th July.....letters are yet to be dispatched....u will be getting them this week only (as been told by their executive)...
By Vipul on Investment in NCR Projects : An Economy Times anal... on 6/28/10
Hi Gyani....I had been to site last weekend and observed that the progress of work is a bit slower than what is used to be....might be of scorching heat in NCR. The 5th floor slab is still yet to be completed for Vinayak block (Vinayak is leading all blocks in progress). So we might have to wait for another 15-20 days for next demand.
By Vips2810 on Investment in NCR Projects : An Economy Times anal... on 6/25/10
Guys.. No one there for update... NCR Guys.. please wake up. :)
By Gyani on Investment in NCR Projects : An Economy Times anal... on 6/25/10
Ya Vipul, If you can observe in my below post that most of the blocks are about to complete the 5th floor. The pics are 20 days old. So, by the time most of them would have already completed. http://mahagunpuram.blogspot.com/2010/05/mahagun-mahagunpuram-development-status.html
By Gyani on NH24 may become 8 lane very soon : Ghaziabad City ... on 6/3/10
any update on next demand for completion of 5th floor slab? I had a word with one of their executive and he said we can expect next demand anytime in June.
By Vips2810 on NH24 may become 8 lane very soon : Ghaziabad City ... on 6/1/10
By Gyani on Investment in NCR Projects : An Economy Times anal... on 6/29/10
Guys..!!! I got a call from mahagun yesterday regarding next payment...last date is 10th July.....letters are yet to be dispatched....u will be getting them this week only (as been told by their executive)...
By Vipul on Investment in NCR Projects : An Economy Times anal... on 6/28/10
Hi Gyani....I had been to site last weekend and observed that the progress of work is a bit slower than what is used to be....might be of scorching heat in NCR. The 5th floor slab is still yet to be completed for Vinayak block (Vinayak is leading all blocks in progress). So we might have to wait for another 15-20 days for next demand.
By Vips2810 on Investment in NCR Projects : An Economy Times anal... on 6/25/10
Guys.. No one there for update... NCR Guys.. please wake up. :)
By Gyani on Investment in NCR Projects : An Economy Times anal... on 6/25/10
Ya Vipul, If you can observe in my below post that most of the blocks are about to complete the 5th floor. The pics are 20 days old. So, by the time most of them would have already completed. http://mahagunpuram.blogspot.com/2010/05/mahagun-mahagunpuram-development-status.html
By Gyani on NH24 may become 8 lane very soon : Ghaziabad City ... on 6/3/10
any update on next demand for completion of 5th floor slab? I had a word with one of their executive and he said we can expect next demand anytime in June.
By Vips2810 on NH24 may become 8 lane very soon : Ghaziabad City ... on 6/1/10
[+] May-2010
Warm Welcome to our new member Chhetra pal. Please tell us something about you, via comment section.
By Gyani on NH24 may become 8 lane very soon : Ghaziabad City ... on 5/25/10
Thats really great. At least multiple sources confirms about this information.
By Gyani on NH24 may become 8 lane very soon : Ghaziabad City ... on 5/20/10
There is another link supporting the above: http://www.thefreelibrary.com/NH-24+to+be+8-laned+to+end+traffic+woes+of+Gzb+residents.-a0226111044
By Kapil Tyagi on NH24 may become 8 lane very soon : Ghaziabad City ... on 5/20/10
Thanks for the update Manoj.
By Gyani on Mahagunpuram related miscellaneous updates and rem... on 5/19/10
hi, i got the demand letter for optional items.
By Manoj Kumar Dhankhar on Mahagunpuram related miscellaneous updates and rem... on 5/18/10
Thanks Kapil for sharing this news.
By Gyani on Mahagun Mahagunpuram Development status : Site Pic... on 5/18/10
http://epaper.hindustandainik.com/Web/Article/2010/05/03/003/03_05_2010_003_011.jpg
By Kapil Tyagi on Mahagun Mahagunpuram Development status : Site Pic... on 5/18/10
Thanks a lot for your kind support. I'd love see the snaps soon. Thanks again.
By Vipul on Mahagun development sit picture : 15-April-2010 on 5/18/10
Hi Vipul, I have got latest pics of Mahagunpuram development site, which clearly show that Vinayak tower will get its 5th slab very soon. However, I think the demand letter would be released in one go for all the towers with 30th Sep deadline. I will post the pictures soon. Regarding demand letter, I will keep a check and post on the blog about.
By Gyani on Mahagun development sit picture : 15-April-2010 on 5/18/10
Thanks for update Gyani. I am prepared for 30 May installment of parking and EDC. I have been to side in April end. At that time they were planning for 4th floor roof. So I think for Vinayak tower, they may raise demand after 5th floor slab anytime during June. I'll be grateful if you may please make me informed in case you get any update as I have already told, I am out of Delhi for 1 month.
By Vipul on Mahagun development sit picture : 15-April-2010 on 5/17/10
Hi Vipul, I think, Mahagun has not yet sent installment of 5th floor roof. The Ground floor roof was completed in March-Mid. from this pace, we should expect next demand letter somewhere near August-mid or later. However, the demand letter for misc payment installment should be expected (due date 30-May)
By Gyani on Mahagun development sit picture : 15-April-2010 on 5/17/10
Hi Manoj, Your request is approved. Thanks for joining:)
By Vinay on Manahgun Mahagunpuram Flats : 3D Models on 5/17/10
sorry to bother you guys....am out of town for a month or so...I'll be more than grateful if any one may please let me know if Mahagun has raised demand after completion of 5th floor roof slab....
By Vipul on Mahagun development sit picture : 15-April-2010 on 5/17/10
Hi Manoj, The Orkut community is moderated by our blog member Vinay. I hope, he will approve it soon.
By Gyani on Manahgun Mahagunpuram Flats : 3D Models on 5/15/10
Till now, it seems to be on schedule. As, last time; they were sure to complete ground floor slab in March; and indeed completed. In fact I have heard that, they plan to raise the floors from 14 to 19; and still confident to get it completed by December-2011.
By Gyani on Mahagun development sit picture : 15-April-2010 on 5/15/10
Any idea if the project is going on schedule...???
By Vipul on Mahagun development sit picture : 15-April-2010 on 5/14/10
A sent request on orkut also, please approve
By Manoj Kumar Dhankhar on Manahgun Mahagunpuram Flats : 3D Models on 5/14/10
Most welcome Manoj... Please join us on this forum as follower and also on Orkut. There is a forum with name Mahagunpuram on Orkut.. you can search that easily...
By Gyani on Manahgun Mahagunpuram Flats : 3D Models on 5/11/10
Thanks
By Manoj Kumar Dhankhar on Manahgun Mahagunpuram Flats : 3D Models on 5/11/10
Thanks Kapil for sharing the pics, will put soon on the blog.
By Admin on Ghaziabad update: Ghaziabad जिला बनेगा हाइवे ऑफ़ ... on 5/5/10
By When, we cant say.. as UP govt is more busy in creating Elephant.... so even though they spare some time for this, they will fall short of money :P
By Admin on Ghaziabad update: Ghaziabad जिला बनेगा हाइवे ऑफ़ ... on 5/5/10
Hi Fariz, You are correct. Recently, there was a news on TV, where people in Rajasthan are guarding Well/Water resources using Gun and Locks. If we do not awake form the mother nature's pointers, may be future will be difficult to survive.
By Admin on We forget that the water cycle and the life cycle ... on 5/5/10
a recent report that due to acute shortage of drinking water bangladesh govt. were forced to deploy army to guard the water storage facilities . .... may be this is the begining of the future wars. "war for water"
By fariz on We forget that the water cycle and the life cycle ... on 5/3/10
By Gyani on NH24 may become 8 lane very soon : Ghaziabad City ... on 5/25/10
Thats really great. At least multiple sources confirms about this information.
By Gyani on NH24 may become 8 lane very soon : Ghaziabad City ... on 5/20/10
There is another link supporting the above: http://www.thefreelibrary.com/NH-24+to+be+8-laned+to+end+traffic+woes+of+Gzb+residents.-a0226111044
By Kapil Tyagi on NH24 may become 8 lane very soon : Ghaziabad City ... on 5/20/10
Thanks for the update Manoj.
By Gyani on Mahagunpuram related miscellaneous updates and rem... on 5/19/10
hi, i got the demand letter for optional items.
By Manoj Kumar Dhankhar on Mahagunpuram related miscellaneous updates and rem... on 5/18/10
Thanks Kapil for sharing this news.
By Gyani on Mahagun Mahagunpuram Development status : Site Pic... on 5/18/10
http://epaper.hindustandainik.com/Web/Article/2010/05/03/003/03_05_2010_003_011.jpg
By Kapil Tyagi on Mahagun Mahagunpuram Development status : Site Pic... on 5/18/10
Thanks a lot for your kind support. I'd love see the snaps soon. Thanks again.
By Vipul on Mahagun development sit picture : 15-April-2010 on 5/18/10
Hi Vipul, I have got latest pics of Mahagunpuram development site, which clearly show that Vinayak tower will get its 5th slab very soon. However, I think the demand letter would be released in one go for all the towers with 30th Sep deadline. I will post the pictures soon. Regarding demand letter, I will keep a check and post on the blog about.
By Gyani on Mahagun development sit picture : 15-April-2010 on 5/18/10
Thanks for update Gyani. I am prepared for 30 May installment of parking and EDC. I have been to side in April end. At that time they were planning for 4th floor roof. So I think for Vinayak tower, they may raise demand after 5th floor slab anytime during June. I'll be grateful if you may please make me informed in case you get any update as I have already told, I am out of Delhi for 1 month.
By Vipul on Mahagun development sit picture : 15-April-2010 on 5/17/10
Hi Vipul, I think, Mahagun has not yet sent installment of 5th floor roof. The Ground floor roof was completed in March-Mid. from this pace, we should expect next demand letter somewhere near August-mid or later. However, the demand letter for misc payment installment should be expected (due date 30-May)
By Gyani on Mahagun development sit picture : 15-April-2010 on 5/17/10
Hi Manoj, Your request is approved. Thanks for joining:)
By Vinay on Manahgun Mahagunpuram Flats : 3D Models on 5/17/10
sorry to bother you guys....am out of town for a month or so...I'll be more than grateful if any one may please let me know if Mahagun has raised demand after completion of 5th floor roof slab....
By Vipul on Mahagun development sit picture : 15-April-2010 on 5/17/10
Hi Manoj, The Orkut community is moderated by our blog member Vinay. I hope, he will approve it soon.
By Gyani on Manahgun Mahagunpuram Flats : 3D Models on 5/15/10
Till now, it seems to be on schedule. As, last time; they were sure to complete ground floor slab in March; and indeed completed. In fact I have heard that, they plan to raise the floors from 14 to 19; and still confident to get it completed by December-2011.
By Gyani on Mahagun development sit picture : 15-April-2010 on 5/15/10
Any idea if the project is going on schedule...???
By Vipul on Mahagun development sit picture : 15-April-2010 on 5/14/10
A sent request on orkut also, please approve
By Manoj Kumar Dhankhar on Manahgun Mahagunpuram Flats : 3D Models on 5/14/10
Most welcome Manoj... Please join us on this forum as follower and also on Orkut. There is a forum with name Mahagunpuram on Orkut.. you can search that easily...
By Gyani on Manahgun Mahagunpuram Flats : 3D Models on 5/11/10
Thanks
By Manoj Kumar Dhankhar on Manahgun Mahagunpuram Flats : 3D Models on 5/11/10
Thanks Kapil for sharing the pics, will put soon on the blog.
By Admin on Ghaziabad update: Ghaziabad जिला बनेगा हाइवे ऑफ़ ... on 5/5/10
By When, we cant say.. as UP govt is more busy in creating Elephant.... so even though they spare some time for this, they will fall short of money :P
By Admin on Ghaziabad update: Ghaziabad जिला बनेगा हाइवे ऑफ़ ... on 5/5/10
Hi Fariz, You are correct. Recently, there was a news on TV, where people in Rajasthan are guarding Well/Water resources using Gun and Locks. If we do not awake form the mother nature's pointers, may be future will be difficult to survive.
By Admin on We forget that the water cycle and the life cycle ... on 5/5/10
a recent report that due to acute shortage of drinking water bangladesh govt. were forced to deploy army to guard the water storage facilities . .... may be this is the begining of the future wars. "war for water"
By fariz on We forget that the water cycle and the life cycle ... on 5/3/10
[+] April-2010
You are correct Vipul... The newer projects of Mahagun is not having problems. But Mahagun Manor was the first project executed by Mahagun Builders. There aere few complaints about qulaity of the same on Web.
By Admin on Update on negative review of Mahagun-Manor's bad c... on 4/29/10
http://www.flickr.com/photos/22778920@N00/ Pic for Mahagunpuram site taken 1 week back
By Kapil Tyagi on Ghaziabad update: Ghaziabad जिला बनेगा हाइवे ऑफ़ ... on 4/15/10
Good News. Anyone has idea if NH-24 is becoming 6-lane and by when ?
By Tyagi on Ghaziabad update: Ghaziabad जिला बनेगा हाइवे ऑफ़ ... on 4/14/10
I have a house at Mahagun Mansion, Indirapuram since 2008. I don't think there is any serious concern regarding quality of construction of Mahagun. I wont say that quality was excellent or superior than any builder, but if i see Mahagun alone, I wont complain about the quality of construction or material used at Mahagun Mansion.
By Vips2810 on Update on negative review of Mahagun-Manor's bad c... on 4/14/10
By Admin on Update on negative review of Mahagun-Manor's bad c... on 4/29/10
http://www.flickr.com/photos/22778920@N00/ Pic for Mahagunpuram site taken 1 week back
By Kapil Tyagi on Ghaziabad update: Ghaziabad जिला बनेगा हाइवे ऑफ़ ... on 4/15/10
Good News. Anyone has idea if NH-24 is becoming 6-lane and by when ?
By Tyagi on Ghaziabad update: Ghaziabad जिला बनेगा हाइवे ऑफ़ ... on 4/14/10
I have a house at Mahagun Mansion, Indirapuram since 2008. I don't think there is any serious concern regarding quality of construction of Mahagun. I wont say that quality was excellent or superior than any builder, but if i see Mahagun alone, I wont complain about the quality of construction or material used at Mahagun Mansion.
By Vips2810 on Update on negative review of Mahagun-Manor's bad c... on 4/14/10
[+] March-2010
Hi Vipul, Thanks for the update.
By Admin on Mahagunpuram Development Site pictures : As of 15-... on 3/24/10
Guys, I am still top get the same. I am sure about the completion of ground floor, as I visited the development site recently.
By Admin on Mahagunpuram: Payment demand letter for completion... on 3/24/10
Sorry...forgot to mention...last date for payment is 25th March as mentioned in my demand letter....
By beetle on Mahagunpuram: Payment demand letter for completion... on 3/23/10
I also got the same demand letter, confirming abt the completion of Ground Floor Roof.
By Anonymous on Mahagunpuram: Payment demand letter for completion... on 3/23/10
Some more snaps of site... http://www.flickr.com/photos/48200722@N02/sets/72157623668857472/
By Vipul on Mahagunpuram Development Site pictures : As of 15-... on 3/22/10
I have received the next demand letter from Mahagun today.....you ppl must be receiving in a day or 2....
By Vips2810 on Mahagunpuram Development Site pictures : As of 15-... on 3/22/10
Now I have corrected the pages...
By Admin on Mahagunpuram Development Site pictures : As of 15-... on 3/19/10
hello dwivedi, hope u are fine.having problem in accessing the photo.may be required to be reloaded.
By fariz on Mahagunpuram Development Site pictures : As of 15-... on 3/19/10
Thanks for the comments. I will be soon posting the pictures and other updates... just need to take out some time out of busy office schedule...
By Admin on Mahagun Mahagunpuram Development Status - March 20... on 3/15/10
thanks and very good work. waiting for more from you. welcome Mr rahul to the blog.
By fariz on Mahagun Mahagunpuram Development Status - March 20... on 3/14/10
Most welcome.... I have many updates lined up. Soon will post many pictures and videos and some very good news :)
By Admin on Latest Mahagun's Mahagunpuram project's Layout : M... on 3/11/10
thanks for uploading the layout. can locate now where my flat will be.
By fariz on Latest Mahagun's Mahagunpuram project's Layout : M... on 3/10/10
Hi Vinay, I have posted the New Bus stand location of Ghaziabad, through Wikimapia. http://mahagunpuram.blogspot.com/2010/03/ghaziabad-new-bus-stand-on-wikimapia.html It is near the + sign on your mouse cursor. -Gyani
By Gyani on Ghaziabad Metro Update : Running till Vaishali, No... on 3/9/10
hi GDA website shows future expansion plan for the metro. hope by sept.2011 the plans will materialise.
By fariz on Ghaziabad Metro Update : Running till Vaishali, No... on 3/5/10
Are there any chances of metro coming up to new bus stand in future any time?
By Vinay on Ghaziabad Metro Update : Running till Vaishali, No... on 3/3/10
where is this new bus stand located, which is being proposed for metro station?
By Vinay on Ghaziabad Metro Update : Running till Vaishali, No... on 3/3/10
Hi, Does any of you have idea about widening of NH24 as i heard sometime back that it would be a 6 lane highway, but nothing seems to happening on this by the Ghaziabad Authority. Thanks Vinay
By Vinay on Ghaziabad Metro Update : Running till Vaishali, No... on 3/3/10
By Admin on Mahagunpuram Development Site pictures : As of 15-... on 3/24/10
Guys, I am still top get the same. I am sure about the completion of ground floor, as I visited the development site recently.
By Admin on Mahagunpuram: Payment demand letter for completion... on 3/24/10
Sorry...forgot to mention...last date for payment is 25th March as mentioned in my demand letter....
By beetle on Mahagunpuram: Payment demand letter for completion... on 3/23/10
I also got the same demand letter, confirming abt the completion of Ground Floor Roof.
By Anonymous on Mahagunpuram: Payment demand letter for completion... on 3/23/10
Some more snaps of site... http://www.flickr.com/photos/48200722@N02/sets/72157623668857472/
By Vipul on Mahagunpuram Development Site pictures : As of 15-... on 3/22/10
I have received the next demand letter from Mahagun today.....you ppl must be receiving in a day or 2....
By Vips2810 on Mahagunpuram Development Site pictures : As of 15-... on 3/22/10
Now I have corrected the pages...
By Admin on Mahagunpuram Development Site pictures : As of 15-... on 3/19/10
hello dwivedi, hope u are fine.having problem in accessing the photo.may be required to be reloaded.
By fariz on Mahagunpuram Development Site pictures : As of 15-... on 3/19/10
Thanks for the comments. I will be soon posting the pictures and other updates... just need to take out some time out of busy office schedule...
By Admin on Mahagun Mahagunpuram Development Status - March 20... on 3/15/10
thanks and very good work. waiting for more from you. welcome Mr rahul to the blog.
By fariz on Mahagun Mahagunpuram Development Status - March 20... on 3/14/10
Most welcome.... I have many updates lined up. Soon will post many pictures and videos and some very good news :)
By Admin on Latest Mahagun's Mahagunpuram project's Layout : M... on 3/11/10
thanks for uploading the layout. can locate now where my flat will be.
By fariz on Latest Mahagun's Mahagunpuram project's Layout : M... on 3/10/10
Hi Vinay, I have posted the New Bus stand location of Ghaziabad, through Wikimapia. http://mahagunpuram.blogspot.com/2010/03/ghaziabad-new-bus-stand-on-wikimapia.html It is near the + sign on your mouse cursor. -Gyani
By Gyani on Ghaziabad Metro Update : Running till Vaishali, No... on 3/9/10
hi GDA website shows future expansion plan for the metro. hope by sept.2011 the plans will materialise.
By fariz on Ghaziabad Metro Update : Running till Vaishali, No... on 3/5/10
Are there any chances of metro coming up to new bus stand in future any time?
By Vinay on Ghaziabad Metro Update : Running till Vaishali, No... on 3/3/10
where is this new bus stand located, which is being proposed for metro station?
By Vinay on Ghaziabad Metro Update : Running till Vaishali, No... on 3/3/10
Hi, Does any of you have idea about widening of NH24 as i heard sometime back that it would be a 6 lane highway, but nothing seems to happening on this by the Ghaziabad Authority. Thanks Vinay
By Vinay on Ghaziabad Metro Update : Running till Vaishali, No... on 3/3/10
--------------------------------------------------------------