REPLY DATED 5TH DECEMBER, 2013 RECEIVED FROM IGL, NEW DELHI REGARDING SANCTIONING OF DOMESTIC PNG CONNECTIONS FOR THE RESIDENTS OF MAHAGUN PURAM, NH-24, MEHRAULI, GHAZIABAD IS GIVEN AS UNDER (FOR FUTURE COURSE OF ACTION, IF ANY, BY THE RESIDENTS OF MAHAGUN PURAM, NH-24, GHAZIABAD) :-
"Sir,
This refers to the provision of domestic PNG connections at Mahagunpuram, NH-24, Ghaziabad. In this regard we would like to draw your kind attention that the technical feasibility survey of first phase of the project had been conducted several times with the Architect (Ms. Anita Tiwari - Mahagun), AVP - Architect (Ms. Shama Gupta - Mahagun), GM (Projects - Mahagunpuram) and officials from Gyan Peeth Mathur and associates (The Architect of the project).
There is no top cover available above the basement for the laying of our PNG pipeline network. IGL requires minimum depth of 600 mm for the laying of PNG pipeline network with a channel. If normal soil is available, we require depth of 1.2 m for the laying the network. Also, there are some technical constraints for GI (Vertical rising) routing.
Therefore, the first phase of the project is technically not feasible for the provision of domestic PNG connections and the same has been communicated to Mahagun officials.
Thanking You,
Regards,
Sonu Sharma
Additional Manager-PNG Marketing
Indraprastha Gas Limited".